电工作业(操作证)理论试卷3(Electrical work (operation certificate) theory paper 3).docVIP

电工作业(操作证)理论试卷3(Electrical work (operation certificate) theory paper 3).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
电工作业(操作证)理论试卷3(Electrical work (operation certificate) theory paper 3)

电工作业(操作证)理论试卷3(Electrical work (operation certificate) theory paper 3) 1. Topic selection 1. In the power supply line used for mixing power and lighting, the (C) leakage protection device should be selected A, three pole B, two pole C, four pole D, one pole 2. In the three-phase symmetrical ac circuit, the total reactive power is (B) Var A, Q = ULILCos Ф B and Q = ULILsin Ф C, Q, Q = 3 D = ULIL i2lr 3. The label of (C) shall be hung outside the transformer room A, in this work B, forbid closing, someone work C, stop, high pressure danger D, do not switch 4. Voltage (B) of the original payment of transformer A is inversely proportional to the number of turns, which is proportional to the number of turns, which is proportional to the current 5. When the three-phase asynchronous motor runs, the relation of its synchronous rotational speed n1 and n is (C). A, n1 n B, n1 = n C, n1 n D, none of the above 6. The maximum working temperature of F shall be (D) A, 105 ℃, 120 ℃, B C, D, 130 ℃ 155 ℃ 7. When using carbon dioxide to extinguish electrical equipment, pay attention to safety. Use common sense according to fire-fighting equipment. When the concentration of carbon dioxide in the air reaches (D), it will suffocate people A, 3% B, 5% C, 80% D, 10% 8, outage maintenance lines if cross and another circuit or close to, staff and adjacent line distance should comply with the relevant provisions of the adjacent line voltage is 10 kv and below, the distance shall not be less than (A) m A, 0.7 B, 1 C, 1.5 D and 3 9. When the high voltage equipment is grounded, the inside shall not be close to the fault point (B) within m (outside is D). A, 3 B, 4 C, 5 D, 8 10. Basic requirements for relay protection should be satisfied (B) A, selectivity, reliability, rapidity, sensitivity B, safety, reliability, versatility, sensitivity C, safety, economy, speed, reliability D, selectivity, safety, economy, reliability 11. A single-phase transformer with A capacity of 2KVA. The original edge

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档