螺杆式冷水机组维修与保养的六十二种方法步奏(There are sixty-two methods for the maintenance and maintenance of screw water chiller).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
螺杆式冷水机组维修与保养的六十二种方法步奏(There are sixty-two methods for the maintenance and maintenance of screw water chiller)
螺杆式冷水机组维修与保养的六十二种方法步奏(There are sixty-two methods for the maintenance and maintenance of screw water chiller)
Maintenance and maintenance of screw chiller
With the development of our country economy and the improvement of production technology, screw chiller has become an important aspect of most enterprise production cooling demand, therefore screw water chiller applied in the enterprise is more and more widely, but the subsequent related screw water chiller debugging, maintenance and maintenance has then become the important process of screw chiller business owners, screw water chiller is briefly introduced some debugging, maintenance and maintenance methods:
(a) preparation before starting the screw water chiller
The correct debugging of screw water chiller is an important link to ensure the normal operation of refrigeration unit, save energy consumption and prolong the service life. For medium and large refrigeration system installation, debugging, first should be in accordance with the requirements of design drawings, familiar with the layout of the whole system and the connection of know the appearance of the equipment structure and performance of parts, and electric control system and water supply system, etc. For this, the commissioning should be attended by engineers such as refrigeration and hydropower. The user should carefully read the product operation instructions provided by the manufacturer before commissioning and proceed gradually according to the operation requirements. The operator must be trained by the manufacturer to obtain the operation certificate of the unit so as to avoid the fatal damage caused by the wrong operation.
1. Preparation before commissioning
(1) since the screw cold water chiller belongs to the medium and large refrigerating machine, it is necessary to design, install and use such three aspects in the debugging. In order to ensure that the commissioning work is carried out in an orderly manner, it is necessary for the personne
您可能关注的文档
- 管子直径解说(Pipe diameter interpretation).doc
- 管板与壳体连接焊接接头失效的结构因素分析(Structural factor analysis of failure of tube plate and shell connection welded joint).doc
- 算法设计五章习题答案(Algorithm design five chapter answer).doc
- 管理中出现的问题,原因如下(The problems in management are as follows).doc
- 管理学txt(Management TXT).doc
- 管理企业,争创一流!!!(Management enterprise, strive for the best!!!).doc
- 管理接场须知(Guidance notes for management).doc
- 管理苹果那个累啊!(Manage apple that tired!).doc
- 管道布置经验(Experience of piping layout).doc
- 管道施工方案(Pipeline construction scheme).doc
- 蜗杆加工(Worm processing).doc
- 螺杆式水冷冷水机组过渡季与冬季节能安全运行措施小议(The transition season of the screw type water-cooled chiller and the energy-saving and safe operation measures in winter are discussed).doc
- 螺栓术语(英语)(Bolt terminology (English)).doc
- 螺杆机维修(Screw maintenance).doc
- 螺纹刀片(Threaded inserts).doc
- 螺栓规范(Bolt specification).doc
- 螺纹钢的规格及材质(Specification and material of screw steel).doc
- 血液学及检验习题(Hematology and test exercises).doc
- 螺栓锚栓容许拉力表(Bolt anchor allowable tension meter).doc
- 行动是表演艺术的基础——行动的定义(Action is the foundation of performing arts - the definition of action).doc
文档评论(0)