- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
道路测量(Way to measure)
道路测量(Way to measure)
Section 1 personnel organization and equipment allocation
I. personnel organization
1 professional surveying and mapping engineer, 8 certified staff and post surveymen responsible for field measurement work.
2. Equipment
The project is intended to be equipped with TOPCO complete station N211D, laser theodolite (JZ2) control, detection axis and perpendicularity; With the control of the 8 level (dzs3-1) type automatic anping level, the test level is high and the level of flatness, and the elevation transmission adopts the combination of the standard long steel ruler and the water level. Starting from the entry, coordinate with the project schedule to carry out the alignment of the axis and the control of the elevation.
Section 2: positioning line
First, the working conditions
1. Conditions of construction survey operation.
2. The network diagram and other information are ready.
3. The measuring instrument is in good condition after school inspection.
4. The construction site has been leveled and the ground obstacles have been cleared.
5. The red line of construction planning has been released and is well preserved.
6. Surveyor has been familiar with architectural planning red line chart and master plan, building planning red line spacing conform to the requirements of the local city planning, the feature points and calculate the building planning red line and the distance between the size correct labeling on the construction site plan.
7. The surveyor has determined the method and procedure for measuring the discharge line.
Materials and instruments used
1. The surveying engineering mainly USES some scattered and auxiliary materials, including: red brick, white ash, wood pile, iron nails, steel bars, paint, drawing, water, sand, gravel, cement, etc.
2. The measuring engineering mainly USES three instruments: the laser theodolite (JZ2), the water level (DZS3-1), and the TOPCO type total station N211D.
3. The work (with) mainly has: small tape 5 m a
您可能关注的文档
- 装潢谈单技巧(The decorating talk skill).doc
- 装载机的驾驶与操作要领(Driving and operation of the loader).doc
- 装绝美厨房 吊顶材料不容忽视(The decoration of the top of the kitchen can not be ignored).doc
- 装配式围井简介(An introduction to the assembly line).doc
- 装饰举例(Decoration, for example,).doc
- 装饰天花(Decorating smallpox).doc
- 装饰工程计算规则(Decorative engineering calculation rules).doc
- 装饰施工工艺流程(Decorative construction process flow).doc
- 装饰材料 2(Decorative materials 2).doc
- 装饰材料分为实材,板材、片材、型材、线材(Decorative material is divided into solid material, plank, sheet, profile, wire).doc
最近下载
- 2016电工技能与实训(高教版 曾祥富编)教案:触电原因及预防措施.doc VIP
- 2023年改性塑料粒子项目可行性评估方案.docx VIP
- 院级党组织全面从严治党考核工作指标体系.pptx VIP
- 泵站运行工题库(含答案) .pdf VIP
- 2016电工技能与实训(高教版 曾祥富编)教案:安全用电常识.doc VIP
- JGJ 80-2016建筑施工高处作业安全技术规范.pdf VIP
- 新编标准日本语高级篇.pdf VIP
- 信息资源管理(第二版)马费成PPT全套课件.pptx
- 2025年日语能力测试N2级试卷:日语能力测试历年真题与答案解析试题.docx
- 供排水泵站运行工(高级工)理论考核试题及答案 .docx VIP
文档评论(0)