上海定额问答100问(Shanghai qa 100).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
上海定额问答100问(Shanghaiq

上海定额问答100问(Shanghai qa 100) Construction and decoration projects 1. Q: is there a range of applications for high artificial health and mechanical lowering of buildings? A: the ultra high drop effect applies to projects that are more than 20 meters high. It applies only to the following sub-divisions. (1) masonry (except brick foundation, structure and retaining wall); (2) concrete and reinforced concrete (basic, prefabricated components, structures, conveying pumps and conveyance pumps); (3) doors and Windows and timber structure; (4) floor of the building; (5) roof and water proof; (6) anti-corrosion, thermal insulation and thermal insulation; (7) decoration; (8) construction of metal structures. 2. Q: why are the number of artificial days in the buildings with high artificial lowering effect? A: there should be only a different percentage of human health benefits. Q: how do you calculate the cost of high labor reduction and other mechanical reduction? Answer: to design indoor floor (plus or minus 0.000) and calculate the number of working days and other mechanical stations according to the specified range. When the buildings have high and low levels, the proportion of the total construction area should be accounted for according to the vertical cutting of different height, respectively, the number of working days and other mechanical stations of different height are calculated respectively. (this artificial day and its mechanical desk count summary and computation work is automatically generated by computer software, the user simply type the quota of the quota and the proportion of the building area when it occurs.) Q: how to calculate the vertical transport machinery shift? Answer: vertical transport machinery to design indoor floor (plus or minus 0.000) as the boundary, to apply the upper part and the base part of the quota. The upper part of the building area (including the technical layer) is calculated in square meters with the total floor area (including the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档