构件吊装工艺(The construction of component crane technology).docVIP

构件吊装工艺(The construction of component crane technology).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
构件吊装工艺(The construction of component crane technology)

构件吊装工艺(The construction of component crane technology) 1. Component lifting technology (1) the lifting of the column 1. The column and basic bullet line, cup bottom copy (1) the elastic line The column should pop up the center line, the foundation top line and the floor elevation line in the three sides of the cylinder. The center line of the rectangular column is arranged by the center of the center. In addition to the centerline of the rectangular section of the rectangular section, a line with the center line should be played in the flange position to facilitate observation and avoid parallax. In addition, the mounting center line of the roof and crane beams will also be installed on the top of the top and the top of the legs. Based on the positioning axis of the plant, the base line of the base cup will be measured according to the location axis of the plant, and should correspond with the installation center line of the column to be used as the basis for column installation, counterposition and correction. (2) draw the bottom of the cup The bottom copy of the cup is a check and adjustment for the height of the bottom of the cup, so as to ensure the correct elevation of the top of the ox leg after the column hoisting. The adjustment method is: first, the actual elevation h1 of the bottom of the cup is measured, and the actual length of the bottom of the column to the top of the oxen is h2; Then, according to the design of the top of the top of the cow leg, the difference between the height of h and the bottom of the cup is high, and the length of the bottom of the column should be h3 (h3 = H - h1); Second, it (h3) compared with the amount of the actual length (h2), construction error that the bottom elevation of modifier Δ h (Δ h = H3 - h2 = H - h1-h2), and mark it in the cup; Finally, use 1:2 cement mortar or fine stone concrete to wipe the bottom of the cup to the mark. In order to make the bottom elevation modifier (Δ h) positive, column base construction, th

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档