直缝埋弧焊钢管的选用(The selection of straight seam submerged arc welding pipe).docVIP

直缝埋弧焊钢管的选用(The selection of straight seam submerged arc welding pipe).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
直缝埋弧焊钢管的选用(The selection of straight seam submerged arc welding pipe)

直缝埋弧焊钢管的选用(The selection of straight seam submerged arc welding pipe) The selection of straight seam submerged arc welding pipe In order to cooperate with the west gas and east gas transportation project, Shanghai will build a gas high - pressure pipeline network. The pipe is the basic material of the pipe network, which must be absolutely reliable in the high voltage pipe network, otherwise the consequences can be unimaginable. Therefore, safety is the first factor of selection. Shanghai will open its first station in the town of white crane, qingpu, to accommodate natural gas from the west, and the high-pressure gas pipeline network will be expanded to the suburbs and urban areas. Press GB5O25 1 a 94 gas pipeline engineering design specification hierarchies terms, starting from the town of crane, which means the whole Shanghai natural gas high pressure gas transmission pipeline are level 3 and level 4 areas (level 3 region refers to the number at more than 10 units or sections, including the outskirts of residential, commercial, industrial zone, development area, and not enough level 4 regional conditions of densely populated area: 4 regions refers to four layers and four floors above common building centralized area, frequent traffic and facilities more section). Moreover, the vast majority of areas should belong to level 4. According to the standard technical specification of urban natural gas pipeline engineering in DBJ08, a standard of urban natural gas pipeline engineering, this procedure is only applicable to pipeline engineering of natural gas with no more than 1.6 MaP (table pressure). Pressure from the west gas into Shanghai will be much higher than the 1.6 PMa, at the same time, some gas large user in Shanghai gas pressure requirements will be much higher than 1.6 PMa pressure, thus the operation of the Shanghai natural gas high pressure gas transmission pipe network pressure is greater than 1.6 MaP must be considered. 此外,由于天然气用户的发展,上海天然气的使用量在近期的目标值是每年30

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档