- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
自动装置考题(Automatic installation exam)
自动装置考题(Automatic installation exam)
The first chapter
1. Automatic input device for standby power supply and standby equipment: automatic input device for automatic input device for standby power supply and backup equipment, the text symbol AAT
Set aside: a standby power or standby line that has obvious disconnection under normal conditions.
3 dark standby: refers to the standby power or standby equipment that is not disconnected in normal circumstances. Instead, the work is in the state of the section bus, and the segmented circuit breaker can be used for mutual reserve.
Whats with the aat device: when the job power or equipment disconnected because of malfunction, can automatically rapid standby power supply or backup device will be automatically thrown into work, or the compound switch to the standby power.
5 for what are the requirements: (1) the AAT device shall ensure that the work power supply or equipment disconnected before put into standby power supply or equipment (2) the work of busbar voltage disappears, no matter any reason shall be the AAT device (3) the AAT device shall ensure that actions only once (4) the power plant factory with standby power automatic input device should be at the same time satisfy the demands of several working power supply of spare (5) the power plant factory with standby power automatic input device should meet the requirements of switching (6) should check the spare power supply and standby equipment automatic overload situation, as well as the motor since the launch of the situation, when if exceed the permitted load limit or cannot guarantee the startup device and automatic load reduction should be AAT (7) the AAT device, if the standby power supply or standby equipment and fault, and should make its speed relay protection action.
6 why does the AAT device have to be used when the working power is actually disconnecting?
To prevent the input of spare power or spare equipment into fault components, the AAT installation faile
您可能关注的文档
- 民法习题(Civil law problem sets).doc
- 民法学-第七章-诉讼时效-难点分析(Civil jurisprudence - chapter vii - limitation of action - difficulty analysis).doc
- 民法同质补偿原则新思考(The principle of civil law is new thinking).doc
- 民法考试大纲(Civil law exam outline).doc
- 民法复习重点1(The civil law review focus 1).doc
- 民用建筑防空地下室防护通风的设计(Design of protective ventilation for civil building air defense basement).doc
- 民航缩略语解释(Civil aviation abbreviations).doc
- 民航术语解释(Civil aviation terms).doc
- 民间股神技巧总结(A summary of the folk gods skill).doc
- 气体微流量测量及标准装置概论1(Introduction of gas microflow measurement and standard device).doc
- 自学者手机维修1(Self-learned cell phone maintenance 1).doc
- 自然对数(Natural logarithm).doc
- 自然带类型(Natural zone type).doc
- 膨胀式发展的企业如何系统培养人才队伍(How does the expansion of the enterprise system train the talent team).doc
- 自然气象谚语(Natural meteorological proverbs).doc
- 自然景物模拟讲解(Natural landscape simulation).doc
- 自然灾害和人类环保(Natural disasters and human environmental protection).doc
- 自然美销售下滑店门缩量 独特加盟模式被质疑(Natural beauty sales decline the unique franchise model is questioned).doc
- 自然环境复杂的气候(The complex climate of the natural environment).doc
- 自驾车旅游经验谈(We'll talk about self-driving travel).doc
文档评论(0)