- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
DK-1制动机检修(Dk-1 motor maintenance)
DK-1制动机检修(Dk-1 motor maintenance)
DK-1 brake check test guidance materials list
The number that live in test is to determine the effective steps
Table 1 balanced air cylinder plug balanced air cylinder gauge is zero, indicating the train pipe pressure, and pressure rise normal first step and the second step the first step
Table 2 train pipe plugging the train pipe clock indicating zero balanced air cylinder pressure when the locomotive can brake relay valve can exhaust. The first small step and the second step
3 average 159 cocks with gate tube can make the rear car brake, but the size of the gate can make the rear car ease. First step
4 distribution valve safety valve adjustment pressure is too high or too low, big brake emergency brake position, brake cylinder pressure is more than or less than 450 + 10KPA, safety valve jet. Second small steps in the first step
5 small brake action tube half block small brake relief, the brake cylinder to slow down (refers to the relief or lower pressure handle, the size of the brake in the translocation to ease normal). When the brake is small, the brake cylinder is slowly raised. The first step is third small steps or third steps
No. 655 pressure regulating valve is too high or too low. When the switch is shifted, the pressure of the balance cylinder and the pipe is over or lower than the constant pressure above 10kpa. The first step in the first step
7 relay valve cock 115 train pipe half closed train pipe are the first step of the slow decompression boost of fifth steps and second steps of the sixth step
8 relay valve total air cylinder cock half closed pipe fully train slowly and the decompression speed normal first step of fifth steps and second steps of the sixth step
9821, broken or re reported, air valve coil, circuit breaker, emergency brake position, balance cylinder, maintain a certain pressure, the first step of the second steps
10, 208SA fault, contact breaker or 208SA800 line open brake, in the brake position can no
您可能关注的文档
- CAD快捷键详述(CAD shortcuts detail).doc
- cad快捷键说明(Cad shortcuts).doc
- cad快捷(Cad and fast).doc
- cad教程 第5章(Cad tutorial 5).doc
- CAD教程第12章-画组合体三视图的方法和步骤(CAD tutorial chapter 12 - methods and steps to draw a three-view view of a group).doc
- cad教程第2章(Cad tutorial 2).doc
- CAD教程第八章(CAD tutorial 8).doc
- CAD机械制图(第九章 装配图)(CAD mechanical drawing (chapter 9 assembly drawing)).doc
- CAD的功能应用(Functional application of CAD).doc
- CAD画图应用命令(CAD drawing application command).doc
- dMax最新最全快捷键(The latest and most complete keyboard shortcut for dMax).doc
- dll初识(DLL first).doc
- dnd神系(DND is god).doc
- dnf npc送礼攻略(DNF NPC gift tips).doc
- dnf 强化装备看灯万能方法(DNF enhances the equipment to look at the power of the lamp).doc
- DNF 附魔列表(DNF attachment list).doc
- DNF70级NPC好感度表(DNF70 NNPC preference meter).doc
- dnf_npc送礼攻略(Dnf_npc gift guide).doc
- DNF副职业赚钱心得(DNF deputy professional earning experience).doc
- DNF卡全信赖NPC喂养攻略(DNF card fully trusts NPCS for feeding strategy).doc
文档评论(0)