- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
模拟施工问题(Simulation construction problem)
模拟施工问题(Simulation construction problem)
Constant live load calculation information:
1: one-time load calculation: mainly used for multi-storey structure, and multilayer structure is best to use this loading calculation. Because the leveling of the construction has little effect on the vertical displacement of the multi story structure, so do not use the analog construction method to calculate.
2: simulation construction method 1 loading: that is according to the general simulation construction method load, to the high-rise structure, usually use this method to calculate. But for the frame shear structure, this method is used to calculate the internal force of the foundation. The internal force of the shear wall is especially large, which makes it difficult to design the foundation under the shear wall. So there is the next vertical loading method.
3: the simulation of 2 construction methods: This is the loading on the basis of vertical component simulation construction method 1 (column, wall) of the stiffness increases by 10 times and then the structure of the internal force calculation, that is according to the construction simulation method 1 loading cases were calculated. The force transmitted to the foundation by this method is even and reasonable, and the axial force of the wall is far greater than the axial force of the column. Just because the amplification degree vertical component, the vertical displacement of the beam ends to reduce the difference, reduce the shear, this weakened the floor load stiffness due to internal forces caused by redistribution, so this method is more close to the manual calculation.
But I think this method has enlarged the linear stiffness ratio of the vertical member and the horizontal member artificially, so its calculation method is worth discussing. Therefore, experts suggest: in the upper structure of the calculation, the use of simulation construction method 1; in the basis of calculation, using simulation construction method
您可能关注的文档
- 电力系统识别.ppt
- 电力练习.doc
- 电力设备优先测试周期.doc
- 电力系统谐波的原因.doc
- 电力设备拆装评估参考.doc
- 甲虫发动机.ppt
- 电力课程计划.doc
- 电力和发电机.ppt
- 电力载波通信的发展与特征.doc
- 电力和能源的变化.doc
- 部分可观测性下组合任务运动一种基于优化方法camille phiquepal 1153.pdf
- pcf2测量报告全尺寸part.pdf
- 画猫男孩级读者剧场剧本根据民间故事改编由kitty the boy who drew cats.pdf
- 文本说明二阶段-2x1000mw1acfc.pdf
- 批准hcki534d 544d-绕组技术数据表hcki5d 17 td en rev.pdf
- uu24m6-检测按键灯网口等.pdf
- 文案技术数据表2007technical datasheet.pdf
- 3g sleep mode application note睡眠模式应用程序说明.pdf
- 芯驿电子科技教程302 petalinux安装.pdf
- 案例shapemonkey用户指南2017 dan ebberts orrin user.pdf
文档评论(0)