回采巷道冲击地压事故分析与防治措施管理(Analysis and prevention measures of rock burst accident in mining tunnel).docVIP

回采巷道冲击地压事故分析与防治措施管理(Analysis and prevention measures of rock burst accident in mining tunnel).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
回采巷道冲击地压事故分析与防治措施管理(Analysis and prevention measures of rock burst accident in mining tunnel)

回采巷道冲击地压事故分析与防治措施管理(Analysis and prevention measures of rock burst accident in mining tunnel) Rockburst is one of the typical dynamic disasters in coal mining, usually in the mechanical system of coal and rock reaches the ultimate strength, with sudden, sharp, violent release form of elastic energy, resulting in coal seam with instantaneous destruction of pulverized coal and rock impact damage of roadway and casualty accidents [1]. With the increase of mining depth and mining intensity, more and more rock burst accidents occur and become more and more serious. Shuangyashan Mining Group mine No. 16 Yan Dongrong two layer ten surface occurred several rockburst in mining two south, these accidents not only seriously affect the normal use of the roadway, but also a serious threat to the safety of miners. Therefore, relevant control measures should be taken in time to avoid greater losses [2]. 1 accident introduction From June 12th to June 28th, the 16 layers and ten sides of the blanking channel in the two lower mining area of south 3 consecutive shocks occurred. The scene of the accident is shown in figure 1. In June 12th, after the accident, the film help range of about 15 meters. On the spot, 3 workers were washed down by the support and the pieces of coal buried, because the rescue in a timely manner, without causing casualties, but seriously injured 1 people. In June 20th, after the accident, the bucket machine rushed down, the railway and stock, the film to help the range of about 25 meters, the visual help on the film into the deep 2.5 meters, without causing casualties. After the accident in June 28th, on the serious side extrusion zone of 30 meters, 50 meters in the affected area, the whole mobile switch, to help, 2 workers were rushed back to help and support the coal buried, due to the timely rescue caused no casualties. Fig. 112 scene of rock burst accident 2 Analysis of rock burst accident 2.1 accident characteristics (1) sudden, without obvious macroscopic

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档