地基与基础工程质量预控(Quality control of foundation and foundation engineering).docVIP

地基与基础工程质量预控(Quality control of foundation and foundation engineering).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地基与基础工程质量预控(Quality control of foundation and foundation engineering)

地基与基础工程质量预控(Quality control of foundation and foundation engineering) Pre-control of Foundation and foundation engineering quality Soil (lime) pile is not dense, broken 1. Construction Preparation: (1) on-site drilling, tamping and compaction effect test to determine the thickness of layered fill, tamping times, tamping The dry density and the compaction effect of the soil between the piles, the suitable pile center distance and the diameter of the pile are required. (2) The selection of lime-soil material should be screened, the size is not greater than 15mm, organic matter content is not small. Used as a lime Lime should also be sifted, size should not be greater than 5mm, and must not be sandwiched with raw lime blocks and contain too much water -。 The volume ratio of 2:8 or 3:7 (lime: soil) is used to stir until even. 2. Operation Process: First dig the Foundation pit, reserve 200~300mm soil, and then in the pit construction lime pile, before the foundation of construction Then dig the stirred soil. The hole-forming method of pile is generally used for 0.6 ton or 1.8 ton diesel piling machine to design the same The diameter of the steel pipe pile in the ground, drawn into holes. Hole verticality Deviation should be less than 1.5%, aperture deviation is not greater than 50mm. The construction sequence of the pile should be arranged in the outer row first, the row should be spaced at intervals, so as not to cause the adjacent A hole produces a shrinkage or collapse. When the hole reaches the required depth, the soil should be compacted immediately. Before filling the hole should be clear the bottom, Not less than 8 times of tamping and tamping. Pile hole should be layered backfill compaction, each backfill thickness 350~00mm. With manpower or simple mechanical compaction. At the time of punching, the quantity bucket is measured to the bottom of the pile hole and the layer is compacted. If you use a company Continue tamping machine will be soil with shovel with the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档