建设单位反索赔(Counterclaim of construction unit).docVIP

建设单位反索赔(Counterclaim of construction unit).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建设单位反索赔(Counterclaim of construction unit)

建设单位反索赔(Counterclaim of construction unit) The counter claim refers to the construction unit (owners) to work units (Contractor) claim. The main way for the construction unit to claim compensation from the construction unit is to reduce or prevent the possible claim; two is the counter claim, and the claim against the (balanced) construction unit. Construction units to claim claims from construction units include: (1) counterclaim for delayed construction period; When the construction period is delayed, it belongs to the construction unit, and the construction unit makes a claim on the construction unit, which means the construction unit pays the liquidated damages for completion of the construction. The construction units in determining the default rate, the general should consider the following factors: the construction unit profit loss; due to extension of time caused by the increase in loan interest; engineering supervision fee period to bring additional drag; because the project tardiness completion cannot be used to hire other building the rental fee. The calculation method of liquidated damages is stipulated in each contract document, and the amount of compensation is generally calculated according to the amount of compensation for each day delay. The total amount of compensation is not more than 10% of the total amount (two) construction defects claim; Refers to the construction quality of the construction unit does not conform to the technical specification for the construction requirements, or the use of the equipment and materials do not conform to the provisions of the contract, or should be responsible for the repair project is not completed before the full warranty period, the construction unit construction units have the right to pursue responsibility. If the construction unit fails to complete the repair work within the prescribed time limit, the construction unit has the right to employ another person to complete the work, and the expenses incurred

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档