野芷湖特大桥主跨钢管拱整体吊装施工

野芷湖特大桥主跨钢管拱整体吊装施工[摘要]:武汉北编组站南湖至大花岭联络线野芷湖特大桥主跨为56m钢筋混凝土加劲拱结构,跨越既有南环铁路而设,拱为56m下承式钢管拱。钢管拱采用工厂预制,现场组拼,现场采用100T和200T吊机同时整体起吊安装。 [关键词]:钢管拱;整体吊装;既有线施工安全 [Abstract]: The North Marshalling Station of Wuhan South Lake to Da Hualing tie-line Ye Zhihu Bridge,consists of 56m length main span stiffening of reinforced concrete and arch structure ,and acrosses the existing South Central railway site which exists 56m steel tubular arch. The steel arch was plants prefabricated and on-site assembled. 100T and 200T cranes were used on-site to lifting the steel arch and accomplish the whole installation.