pmbok第7章项目成本管理(PMBOK seventh chapter project cost management).docVIP

pmbok第7章项目成本管理(PMBOK seventh chapter project cost management).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
pmbok第7章项目成本管理(PMBOK seventh chapter project cost management)

pmbok第7章项目成本管理(PMBOK seventh chapter project cost management) Which of the following 1 words is best suited for describing cost projections? The process of A, probability estimation, uncertainty, and the future trend of inflation that may occur during the project B combines the process of predicting the cost of a projects life cycle C the process of establishing budgets, standards, and monitoring systems that can be used to evaluate and manage project investment costs D a continuous process of collecting, accumulating, analyzing, monitoring, reporting, and managing costs 2 、 consider the project schedule in the cost budget process A, you can identify the project factors, and then cost allocation B allows the allocation of costs to the time period where costs are incurred C provides another way to help evaluate and monitor cost performance D, A, and B 3 which of the following is not a trade-off decision in the preparation of a project plan? A, skilled or unskilled labor? B, the supplier should gain profit and profit othervendors havereceived in the past. C, who had contracted to the subcontractor D importance of cost / quality 4 which of the following estimation techniques can be used in prototyping? A, parameter B extrapolation C and analogy D, historical results 5. The four type of cost in the conceptual phase of the life cycle budget is: A, operation / maintenance, scrap, direct, variable B, indirect, auxiliary, development, production C, operation / maintenance, development, production D, indirect, auxiliary, indirect, direct Which of the following 6 depreciation methods is most detrimental to taxation? A, double declining balance B, straight line C, the annual sum of digits D, salvage 7 which of the following is the most conservative work completion principle? A and 50/50 principles B and 0/100 principles C and 20/80 principles D and 100/100 principles 8 who should be responsible for determining the acceptable range of the project cost variance? A, function mana

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档