冬季安装地暖的经验之谈(The installation of the winter to warm the wise remark of an experienced person).docVIP

冬季安装地暖的经验之谈(The installation of the winter to warm the wise remark of an experienced person).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
冬季安装地暖的经验之谈(The installation of the winter to warm the wise remark of an experienced person)

冬季安装地暖的经验之谈(The installation of the winter to warm the wise remark of an experienced person) The installation of the winter to warm the wise remark of an experienced person Warm water heating cable to cement pavement, general installation time is 3-4 days, need to do more detailed engineering. Because once the ground is broken, repair more troublesome. Heating installation has become the most attention process at the moment. Traditional radiators and air conditioners use hot air convection to regulate indoor temperature. The floor radiation heating is the use of buried under the floor of the pipe system to the indoor radiation heat and gradually increase the room temperature. At present, there are two ways of floor heating: one is buried water coil, the other two is buried heating cable. Buried water coil is one of the methods used in our country. At present, heating into our country about five or six years, the market is not standardized, so there are more problems, mostly because some manufacturers can not reach heating standards, the effect is not good. Floor radiation heating system construction should be carried out separately, so to warm the user, first of all to warm the company and decoration company in advance communication, coordination work with the process. Ensure the construction of water and electricity pipelines before construction Before the installation of floor heating system, should ensure that the construction site of hydropower pipeline construction is completed, after the closed water test and after acceptance should be a kitchen and a bathroom, the construction area clean the ground flat, without any influence of construction equipment, materials and sundries. About 120 square meters of flat housing, floor heating construction period is generally three or four days, for the control system requires higher thermocline units, the construction period of about one week. Before installing the floor heating, gradually increase the temperature of the

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档