asn#230;s power station nicholas kristensen, bwe …(asn # 230;s电站尼古拉斯u2022kristensen防波堤入口u2026).pdf

asn#230;s power station nicholas kristensen, bwe …(asn # 230;s电站尼古拉斯u2022kristensen防波堤入口u2026).pdf

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
The flexible design of the CT-121 FGD – a perfect match for DONG Energy’s Asnæs Power Station Nicholas Kristensen, BWE A/S (Denmark); Sohsuke Kido, Chiyoda Corporation (Japan) 1 Introduction The two older coal fired boilers #2 and #4 at the Asnaes Power station are not equipped with flue gas desulphurization equipment. Therefore, as the latest emission requirements of the EU Large Combustion Plant Directive cannot be met, the two units can no longer be operated. The plant owner DONG Energy has decided to install a new FGD plant to treat the flue gas from the 147 MWe Unit 2 while Unit 4 has been mothballed. One design criteria for the new Unit 2 FGD has been that, with only minor modifications, the system must be able to treat the effluents from a possible future upgrade of the 400 MWe Unit 4. Focus by the client has been on a simple though reliable low cost solution and a short project execution time of 23 months. Among other things this scrubber will be the first outdoor FGD plant for a Danish utility boiler and also the first Danish FGD with a wet stack. To overcome the pressure drop of the FGD system, a new booster fan will be installed in the A position, upstream the FGD (outside the scope of the FGD supply). There will be no by- pass system and the treated flue gas will be led directly from the FGD to the wet stack (also outside the FGD scope) without reheating . At the absorber outlet, there will be an empty casing for a possible future flue gas reheater to be installed. The Jet Bubbling Reactor (JBR) itself plus mist eliminator and reheater casing will be made of flaked glass-lined carbon steel, the flue gas cooling inlet section will be made of solid Hastelloy C276, and the clean gas duct will be made of FRP. 2 The CT-121 jet bubbling process The heart of the process is the Jet Bubbling Reactor (JBR). As oppos

文档评论(0)

hhuiws1482 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:5024214302000003

1亿VIP精品文档

相关文档