The flexible design of the CT-121 FGD
– a perfect match for DONG Energy’s
Asnæs Power Station
Nicholas Kristensen, BWE A/S
(Denmark);
Sohsuke Kido, Chiyoda Corporation
(Japan)
1 Introduction
The two older coal fired boilers #2 and #4 at the Asnaes Power station are not equipped with
flue gas desulphurization equipment. Therefore, as the latest emission requirements of the EU
Large Combustion Plant Directive cannot be met, the two units can no longer be operated.
The plant owner DONG Energy has decided to install a new FGD plant to treat the flue gas
from the 147 MWe Unit 2 while Unit 4 has been mothballed. One design criteria for the new
Unit 2 FGD has been that, with only minor modifications, the system must be able to treat the
effluents from a possible future upgrade of the 400 MWe Unit 4.
Focus by the client has been on a simple though reliable low cost solution and a short project
execution time of 23 months.
Among other things this scrubber will be the first outdoor FGD plant for a Danish utility
boiler and also the first Danish FGD with a wet stack.
To overcome the pressure drop of the FGD system, a new booster fan will be installed in the
A position, upstream the FGD (outside the scope of the FGD supply). There will be no by-
pass system and the treated flue gas will be led directly from the FGD to the wet stack (also
outside the FGD scope) without reheating .
At the absorber outlet, there will be an empty casing for a possible future flue gas reheater to
be installed. The Jet Bubbling Reactor (JBR) itself plus mist eliminator and reheater casing
will be made of flaked glass-lined carbon steel, the flue gas cooling inlet section will be made
of solid Hastelloy C276, and the clean gas duct will be made of FRP.
2 The CT-121 jet bubbling process
The heart of the process is the Jet Bubbling Reactor (JBR). As oppos
您可能关注的文档
- ap biology - unauthorized(美联社生物学u2014u2014未经授权).pdf
- apa guide to preparing manuscripts for journal …(apa指南准备手稿杂志u2026).pdf
- apb opinion no. 18, the equity method of accounting for investments in(apb意见没有。18日,占投资的权益法).pdf
- anthropometry and workspace design - cornell …(人体测量学和工作空间设计u2014u2014康奈尔大学u2026).pdf
- api standard 617 - axial and centrifugal and …(api标准617 -轴流式和离心式和u2026).pdf
- api q2 specification for quality management …(api q2规范质量管理u2026).pdf
- ao trauma course principles in operative …(ao创伤手术原则中u2026).pdf
- appendix 3b and asic form 484 for personal …(附录3 b和asic 484个人u2026).pdf
- annuity evaluation service - annuity assist(年金服务u2014u2014年金协助评估).pdf
- apollo hospitals enterprise ltd - crisil(阿波罗医院企业有限公司- crisil的).pdf
文档评论(0)