电缆工程工程量计算规则(Rules for calculation of quantities of cable engineering)

电缆工程工程量计算规则(Rules for calculation of quantities of cable engineering) Rules for the calculation of quantities of cable engineering -- (summary) 1. The excavation of the buried cable and the filling (stone) side, in addition to the special requirements, the earthwork can be calculated by the following table: - - Cable root width; -1~2- 0.45- Every additional one - 0.153- - two, the cable trench cover plate cover, the quota, according to each lid once to delay * meters. If it is uncovered and covered, it will be calculated two times. - Three, the cable protection tube * degrees, in addition to t