测量队工作简介(Survey team work brief).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
测量队工作简介(Survey team work brief)

测量队工作简介(Survey team work brief) Survey team work brief A measurement is a technique for measuring the relative positions of points on a ground point so as to display natural and artificial objects in proportion according to the correct horizontal or vertical relation between them. Measurement is the eye of engineering construction, relating to every link and process of engineering construction, and plays an important role in engineering construction. At the beginning of the project, the surveyor shall contact the site supervision engineer first, carry out the on-site handover of the known construction control network, and obtain the records of the known construction control network and the points. Because of the interference or damage of the earlier construction and the change of the surrounding environment, the control point is likely to drift or subside, so it is necessary to know the repetition of the control network. Then, according to the accuracy of the known construction control network and the accuracy of the equipment equipped with the project, the retest scheme of the construction control network is determined. Generally, the same method is used to retest the known control network. The retest is divided into plane control survey and elevation control survey. Horizontal control survey adopts GPS survey or total station method to measure back. Height control survey adopts leveling method or photoelectric distance trigonometric leveling instead of leveling method. Retest should be carried out in strict accordance with the norms, engineering measurement, water conservancy and Hydropower Engineering Specification for hydropower and water conservancy project measurement norms, norms, GPS measurement or other measurement standards, the occurrence of non-standard gauge or record must be re measured or buce. After the completion of the retest, the external industry will undergo 200% independent inspections, and the accuracy of the error can be adjusted without exce

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档