于2010新版PKPM针对新抗规、高规、混凝土规范的注意事项(In the 2010 edition of the new PKPM for new anti regulation, high standards, concrete specifications notice).docVIP
- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
于2010新版PKPM针对新抗规、高规、混凝土规范的注意事项(In the 2010 edition of the new PKPM for new anti regulation, high standards, concrete specifications notice)
于2010新版PKPM针对新抗规、高规、混凝土规范的注意事项(In the 2010 edition of the new PKPM for new anti regulation, high standards, concrete specifications notice)
In the 2010 edition of the new PKPM for new anti regulation, high standards, concrete specifications notice
1., break through an axis, can only assign a beam limit. (to allow more than the main beam at different heights of an axis layout, the beam spacing should be greater than 500mm or beam height; after the column was broken beam, sectional calculation of the output of each section of the internal force and reinforcement.)
2. walls break through floor level limits. (allow setting of strong roof and bottom of wall; analysis of special-shaped walls such as inclined walls and gable)
3. column and diagonal bar break through the floor elevation limit. (allow elevation of the upper and lower ends of the diagonal bar)
Calculation of 4. sloping plates and pitched roofs. The new software automatically designated the inclined plate as an elastic film and was not affected by the assumption that the rigid rigid floor assumed the order; the oblique plate was not coplanar, and the virtual beam could be added to make it coplanar (100x100)
The slope of the roof [a. layout layer 5. with horizontal beam beam, no floors; B. standard floor, floor (lower eaves node elevation; old version of the software must be connected to the virtual column; arranged at 200mm high in the upper and lower beam version of the software automatically, without layout of the virtual column;)
6. is the concrete side beam hinged?. (6.1.1) stipulates that the main structure shall not be articulated except for individual parts. Rigid A. usually take the default, such as internal force and reinforcement can not meet the requirements to do is processing, and the corresponding structural measures. Too much setting of B. hinged beam will lead to redistribution of internal force. C. beam reinforced concrete analysis of concrete situation, do not blindly set up through the hinge
您可能关注的文档
- 中小学校长身体素质的现状与对策(The present situation and Countermeasures of physical quality of primary and secondary school principals).doc
- 中层经理人发展的中企业培训药良方(Medium enterprise training medicine in the development of middle managers).doc
- 中层经理人发展的中药良方(Traditional Chinese medicine for middle managers).doc
- 中幼林抚育实施方案(Implementation plan of young plantation).doc
- 中文演讲稿(Chinese speech draft).doc
- 中文字符串转换为QString(Chinese string converted to QString).doc
- 中文信息检索工具(Chinese information retrieval tools).doc
- 中旭文化网执行总监王启金做培训致辞全稿(Asahi culture network executive director Wang Qijin to do the training speech full release).doc
- 中海地产面试全过程(China Sea real estate interview process).doc
- 中班主题活动《住宅房》(Middle class residential housing theme activities).doc
- 二等水准(Two leveling).doc
- 于艳菊介绍结缔组织痣四肢的骨和关节平片检查(Yu Yanju presented the joint bone and joint X-ray examination of the connective tissue nevus).doc
- 于斐老师谈保健品该如何成功招商(Yu Fei teacher talk about health care products how successful investment).doc
- 云南世博园导游词(Yunnan Expo Park guide word).doc
- 云南乐事(Yunnan delight).doc
- 云南人文服饰(Yunnan humanity apparel).doc
- 云南当归规范化栽培技术(Standardized cultivation techniques of Angelica sinensis in Yunnan).doc
- 于千万人之中(Among thousands of people).doc
- 云南大理双廊镇的旅游品牌建设(Tourist brand construction of double corridor town in Yunnan, Dali).doc
- 亏讯商品(Missing goods).doc
文档评论(0)