低压配电房操作规范(Operation specification for low voltage distribution room).docVIP

低压配电房操作规范(Operation specification for low voltage distribution room).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
低压配电房操作规范(Operation specification for low voltage distribution room)

低压配电房操作规范(Operation specification for low voltage distribution room) Edit the operation standard of low voltage distribution room I. operation specification for closing and feeding 1. unqualified mechanical and electrical personnel shall not engage in operation. 2. switch off all air switches before switching on. 3. determine the whole line, no operation, no short-circuit phenomenon. 4. check the meter instructions after closing and observe for 5 minutes. Two, power failure operation standard 1. disconnect the air switch of each branch circuit and pull down the switch of each loop knife switch. 2. switch off the main switch of the low-voltage distribution cabinet. 3. hang up the no closing sign. Three 、 maintenance work 1., strictly prohibit live operation. 2. perform maintenance as planned. Edit the safety operation rules of power distribution room 1, send electricity: (building power supply interruption, need to quickly restore power supply) Find out whether it is an external transmission line fault or an internal distribution line fault. External fault: the transformer is not working (no noise, no display screen); internal fault: Transformer work properly (sound, display temperature, fan operation indicator light). Second, the external line fault power failure, and after contact with the power supply department, waiting to restore power transmission. Third, the internal line failure, power failure, quickly identify the cause of the failure, and immediately ruled out the evacuation of electricity. Send the power step: cut off the load switch (especially the lighting part); press the 1# cabinet, 5# cabinet green start button, the voltmeter indicates normal (400V); one by one closed each load switch. If the transformer is working (noise, temperature display), and fan light not bright, that the external transmission line has stopped, and then immediately restore power at this time by starting the cooling fan to power transmission procedures. 2, power outages: (equipm

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档