人防地下室工程裂缝处理方案(Crack treatment scheme of civil air defence basement project).doc

人防地下室工程裂缝处理方案(Crack treatment scheme of civil air defence basement project).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
人防地下室工程裂缝处理方案(Crack treatment scheme of civil air defence basement project)

人防地下室工程裂缝处理方案(Crack treatment scheme of civil air defence basement project) Repair plan of reinforced concrete wall and cracks in civil air basement of Longhu Bay Our construction of the Longhu Bay (VV L7 project) basement project, the main project has been completed the construction of the basement, the basement surrounding backfill has been completed in most; in the basement in quality inspection, found that the exterior wall of the underground small sealing screw at the wet seal, the sealing screw in individual water leakage in roots; the basement roof with a layer of negative in 2013 after pouring the emergence of several shall not crack, appear in the rain water seepage joints, causes and treatment methods for my company project Department of cracks for meeting analysis. First, the cause of the formation of cracks 1, wall sealing screw mainly due to water seepage, demolition early after concrete pouring template, removed when the concrete strength is too low, the water screw holding force is small, because the formwork Chaimo of screw vibration, beating, making part of the screw loosening in concrete, it eventually leads to water penetration. The main reason for cracks in the roof, basement 2: 1, concrete water cement ratio is too large, the shrinkage of concrete, concrete cover; the plastic film covered with other materials are not consolidated, borne by the wind, the soldiers failed to timely watering maintenance; complete the construction, the concrete pouring, the upper stacking time early, the impact force on the surface of the crane transporting materials from falling; cracking time, this part belongs to the early formation of crack crack, through nearly a month of continuous observation, roof cracks are basically stable, not to continue to expand the trend. Two, crack treatment 1, the strength of concrete meets the design requirements, in order to ensure the durability of the use of housing, prevent the roof reinforcement corrosion, cracks closed treatme

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档