网站大量收购独家精品文档,联系QQ:2885784924

国家优质工程煤矿工程现场复查要点(Key points for on-site review of national quality engineering coal mine).doc

国家优质工程煤矿工程现场复查要点(Key points for on-site review of national quality engineering coal mine).doc

  1. 1、本文档共30页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
国家优质工程煤矿工程现场复查要点(Key points for on-site review of national quality engineering coal mine)

国家优质工程煤矿工程现场复查要点(Key points for on-site review of national quality engineering coal mine) Key points for on-site review of national quality engineering coal mine I. mine construction project project Main review content Data to be provided and Physical apparent quality Executive specifications, standard Vertical shaft engineering (1) check the cross section of shaft section and vertical degree of shaft lining; (2) check the quality of shaft lining; (3) check the total water inflow of the shaft; (4) to review the inspection records of concealed works, the test reports of materials and test blocks, and the quality inspection and certification materials of the project; (5) the quality of shaft equipment. (1) the inspection plan of vertical degree of shaft lining and the measured sectional drawing. (2) well completion inspection records, the quality grade is good, real good perception. (3) the total water leakage recorded in the wellbore shall not be greater than 6 tons /h. (4) record of acceptance of concealed works, materials and test block test report. (5) shaft equipment acceptance record, excellent quality and grade, take the cage to feel smooth fou. (1) specifications for construction and acceptance of mine roadways in Peoples Republic of China (GBJ213-90); (2) quality inspection and evaluation standard of Peoples Republic of China coal mine roadway engineering. (MT5009-94) Inclined shaft engineering Tunnel engineering (1) wellhead portal project; (2) well tunnel engineering; (3) ditch project; (4) floor and stair work. (1) the final acceptance record and quality grade are excellent. (2) raw material test and test block test report. (3) the wellhead, portal concrete end wall, wing wall surface is smooth and uniform color. After no obvious wrong station, running mode, the overall outline clear, angle straight line, edge, facing slope firmly, good soil and water conservation, drainage facilities, smooth drainage, no deposit. (4) the bottom plate is smooth and the dra

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档