大工14春《建筑施工》在线测试2答案(Big work 14 spring building construction online test 2 answer).docVIP

大工14春《建筑施工》在线测试2答案(Big work 14 spring building construction online test 2 answer).doc

  1. 1、本文档共16页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大工14春《建筑施工》在线测试2答案(Big work 14 spring building construction online test 2 answer)

大工14春《建筑施工》在线测试2答案(Big work 14 spring building construction online test 2 answer) Big work 14 spring building construction online test 2 Multiple topics First, radio questions (20 questions, 60 points) 1. of the following technical performance parameters for crawler cranes, the correct is (). There is no constraint relationship between the three parameters of A. lifting weight, lifting radius and lifting height B. if the boom boom with the elevation of constant growth, lifting radius and the lifting height is reduced, and the weight increase C. if the jib length is unchanged, as the elevation increases, the weight and the lifting height increases, while lifting radius decreases D. if the jib length is unchanged, as the elevation increases, the weight and the lifting height is reduced, and the lifting radius increases Developing options: C 2. the initial setting time of a C25 concrete at 30 degrees is 210 minutes, for example, when the concrete is transported for 60 minutes, the longest period of pouring and intermission shall be () minutes. A. 110 B. 150 C. 180 D. 90 Developing options: B 3. HPB235 grade steel for ordinary concrete when the terminal needs to do 180 degree hook, the arc bending diameter should not be less than the diameter of the reinforced D () double hook end flat part length not less than D in diameter (Times) steel. A. 3 times, 2.5 times B. 3 times, 3 times C. 2 times, 3.5 times D. 2.5 times, 3 times Developing options: D 4. in the following installation methods, it is suitable for the bolt connection type, the grid structure, and should adopt the suspension construction method with less support. A. high altitude bulk method B. high altitude sliding method C. integral lifting method D. integral lifting method Developing options: A 5. the following method of reserving holes is only applicable to the way of retaining a straight line. A. core pulling method B. pre embedded plastic bellows bore C. pre embedded metal spiral tube hole D. steel tube cor

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档