中国建筑施工网论坛--旋扩珠盘桩旋工方案(Chinese Construction Forum - construction scheme of rotated plate pile).doc
- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国建筑施工网论坛--旋扩珠盘桩旋工方案(Chinese Construction Forum - construction scheme of rotated plate pile)
中国建筑施工网论坛--旋扩珠盘桩旋工方案(Chinese Construction Forum - construction scheme of rotated plate pile)
There are three kinds of people China Construction Forum - rotated plate pile construction scheme of.Txt in the world: one is the conscience of the dog ate, two is the conscience is not the dog person, three is the conscience of even the dogs will not eat people. ), love is a dream, but I overslept
Rotary plate pile construction scheme
Rotary plate pile construction scheme
(1) construction sequence
The preparation of construction, positioning, pile hole positioning, spiral drilling, pile hole, rotary disc, self expanding pile, pile hole cleaning and self inspection of foundation subsoil, covert acceptance, reinforcement cage placed, pouring concrete and concrete curing, pile testing, acceptance.
(two) construction method
1 、 construction preparation and positioning release: inspect the construction site, site layout. Coordinate with the concerned units, complete the work of three links and one leveling, carry out the positioning and laying out of the building, and make a survey and review of the visa record. Construction materials, and prepare materials, re inspection and other preparatory work with a test.
The original hardening floor shall be arranged by the owner of the project to get rid of it.
2, spiral drilling hole
(1) measuring the pile hole and setting out the line, and the hole can be made before the test is correct.
(2) the hole operator shall control the hole size according to the design elevation and the hole depth. After the auger is drilled, it will be checked and accepted in time.
(3) the displacement of the pile hole shall not exceed the relevant regulations: the allowable deviation of the center line of the pile foundation is 70mm, the allowable deviation of the verticality is 1%, the allowable deviation of the diameter of the pile hole is -20mm, and the depth of the pile meets the design requirements.
(4) the cover plate of the orifice so as not to fall in
您可能关注的文档
- --华安盛道管理网 如何在单件装配企业推行精益生产(How to Huaan shendall management network, the implementation of lean production in assembly enterprises).doc
- --华安盛道管理网 定置管理(Huaan Shengdao management network management).doc
- 03判断推理---演绎推理(03 judgment reasoning deductive reasoning).doc
- 12秋《经济法概论》作业3(12 autumn, introduction to economic law, assignment 3).doc
- 2007年感动中国十大人物(2007 moved China's ten great men).doc
- 1959年资料5 中医对泄泻的认识和治疗(Understanding and treatment of traditional Chinese medicine on diarrhea in 1959 5).doc
- 2010年咨询师项目决策分析与评价精选练习及解析(Selection, practice and analysis of consultants' project decision analysis and evaluation in 2010).doc
- 2011初级士基础知识(2011 basic knowledge of Junior School).doc
- 2011年西医综合考研傲视宝典(2011 Western comprehensive examination disdain for the book).doc
- 2011年高考语文试题分类汇编—名篇名句默写(2011 college entrance exam of Chinese famous famous dictation assembly - Classification).doc
最近下载
- DELIXI德力西仪表JKL5CV JKL2CV智能无功功率自动补偿控制器使用说明书 物料号:A0463099500.pdf
- 道路亮化工程项目可行性研究报告.docx
- 幼儿园必备《师德师风培训》-2024鲜版.ppt
- 新北师大版四年级数学上册《认识更大的数》练习题.pdf
- 【西南大学】[机考][0087]《计算机网络》 (3)辅导资料.doc VIP
- 四川327省考行测真题及解析.doc
- (冀教版)八年级生物下册全教案.pdf VIP
- 广东省汕头市2022-2023学年高一下学期期末考试历史试题(解析版).docx
- 专题 事件类记叙文(记叙文阅读)(原卷版).doc VIP
- 颜料红177的制备工艺分析-analysis of preparation technology of pigment red 177.docx
文档评论(0)