体系部内审表(System internal audit form).docVIP

体系部内审表(System internal audit form).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
体系部内审表(System internal audit form)

体系部内审表(System internal audit form) Production department, workshop, department internal audit checklist NO: Trial department: Production Department preparation / date: validation / date: Serial number Check content Terms of reference Reference file Inspection method Inspection result record One Has the A. Organization identified the entire process of production and service? Does B. receive information about production and service processes, including product characteristics, operation instructions, etc.?. Does the equipment, measurement and monitoring equipment used by the C. meet the requirements? Does the D. make effective maintenance of the equipment and make the equipment in good condition? What are the special processes and key processes of E.? Have you implemented any monitoring activities? Is the f. set up a monitoring point that is reasonable, normal and effective? Does the g. staff have the qualifications and qualifications? Does the H. specify the conditions and methods for the release of the product? Is it implemented correctly? What is the responsibility of I. in the work after delivery? 7.5.1 control of production and service provision COP10 COP11 COP03 COP14 (1) ask the production manager: how to determine and plan the whole process of production and service, and the result of planning to ensure that these processes are in a controlled state, and how to implement them? (2) spot sampling 1~2 key process (special process) and 2~3 general process to understand the process management status. Confirm: A. has the documentation of product characteristics required for process control including product standards, drawings, contract requirements, etc.. B. does not guarantee the quality of the process without a job instruction. Does the job instruction exist, such as the preparation of work instructions for critical and complex processes?. Whether the C. equipment meets the requirements, whether the monitoring and measuring device is configured and whether the en

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档