在工程实施过程中,如何加强工程设计变更和工程签证的管理工作(In the process of engineering implementation, how to strengthen the management of engineering design change and project visa).docVIP
- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
在工程实施过程中,如何加强工程设计变更和工程签证的管理工作(In the process of engineering implementation, how to strengthen the management of engineering design change and project visa)
在工程实施过程中,如何加强工程设计变更和工程签证的管理工作(In the process of engineering implementation, how to strengthen the management of engineering design change and project visa)
In the process of engineering implementation, how to strengthen the management of engineering design change and project visa?
[Abstract] a project to easily control the cost, in the project implementation process, the most important is to control the good management of engineering design changes and visa, because has been the blueprint for the design and optimization of evaluation in the early stage of the owner or the construction unit cost has the ideal control range, so to control the the construction unit cost, formulate measures for the management of design change and engineering visa in the project before the start, in order to have rules to follow in the implementation.
[Key words] design change engineering visa management
First, correctly understand the meaning and content of design change and engineering visa, and give definition
Design change: design change is to ensure the quality of design and construction, improve the engineering design, the design of correct design errors and meet the site conditions change and modify the work, including the proposed by the construction units, design units, supervision units, construction units and other units of the design change.
Once the design document has been examined and approved, no unit or individual may change it at will. Because of the change of the construction condition of the project or the actual construction needs, the original design must be thoroughly investigated and fully demonstrated, and all the provisions in the project contract must be observed.
The design of the unit owners proposed change mainly involves: approved construction scale, basic principles, main technical standards, the main function of system, main part, has a significant impact on the external group landscape, main function and main construction scheme, such as the overall layo
您可能关注的文档
- 古韵(archaic rhyme).doc
- 句句在理(Every word is reasonable).doc
- 句型五(Sentence pattern five).doc
- 古代汉语试题(Ancient Chinese examination questions).doc
- 句型转换专项练习(Sentence pattern conversion exercise).doc
- 句子成分,简单句、并列句和复合句(Sentence elements, simple sentences, compound sentences and compound sentences).doc
- 叩启想象的大门,拓展想象的空间 ---- 谈谈想象作文教学(Knocking at the door of imagination, expanding the space of imagination -- Talking about Imaginative composition teaching).doc
- 只问价格不问价值的文学时代(A literary age asking only price and no value).doc
- 叫水法(Water law).doc
- 可 米 路 贝 儿 四 色(Belle four-color comic way).doc
- 第30课 中国特色社会主义新时代和全面建成小康社会 课件中职高一上学期高教版中国历史全一册.pptx
- 11.2树立正确的人生目标 课件 七年级道德与法治上册(统编版).ppt
- Act it out You're late! 课件外研版英语三年级下册.ppt
- 第18课 北洋军阀的统治 课件中职高一上学期高教版中国历史全一册.pptx
- Project 1A good student 课件译林英语三年级下册.ppt
- Unit 2From head to toe第2课时(Story time) 课件剑桥英语三年级下册.ppt
- 7.2共建美好集体 课件 七年级道德与法治上册(统编版).ppt
- Unit 3 My familyLesson 2 课件精通版英语三年级下册.ppt
- 第16课 探索国家出路与挽救民族危亡的斗争 课件 中职高一上学期高教版中国历史全一册.pptx
- 3.1 地球宇宙的奇迹(教学课件) 教科版科学五年级下册.ppt
文档评论(0)