基坑1(Foundation Pit 1).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基坑1(Foundation Pit 1)

基坑1(Foundation Pit 1) (1) the foundation pit surrounding rainwater, take the formation of gullies in the pit bottom brick side, in the mining water ditch ends set, the specific size is as follows: the gullies were obtrapezoid, mouth width 500mm, mouth width 300mm, below the bottom 0.5m. The set of wells with diameter of 0.8m and below the bottom elevation of 1m, after pouring position of drainage sump to quasi built effectively within the drainage pit in the. Water pump is placed in all the water wells, and after the rainwater is collected, the hose is connected with the hose of the submersible pump to flow into the municipal pipe inside the field. 2, well drain well distributed detailed drawings: 3, the choice of groundwater drainage equipment, foundation pit groundwater drainage widely used power pumps, generally motorized, electric, vacuum and siphon pump. When the pump type is used, the displacement of the pump is 1.5 - 2 times as much as that of the foundation pit. When the water quantity of the foundation pit is Q20m3 / h, the diaphragm pump or submersible pump can be used; when the Q is in the 20-60m3 / h, the diaphragm or centrifugal pump or submersible pump can be used; when the Q60 m3 / h, the multipurpose centrifugal pump is used. Diaphragm pump displacement is small, but it can exclude mud water, the choice should be based on the technical performance of water pump selection. According to the size of the actual water, the number and type of precipitation machinery are determined. Fifth sections of earthwork excavation procedures (1) the general order and method of earthwork excavation; The mechanical engineering earthwork delamination excavation, the layer thickness of 20 mm or so, and the foundation pit excavation and retaining mechanical cross synchronously, dig to design elevation of 300mm at the bottom of the pit stop into the artificial excavation, picking up the bottom edge. (two) the method of mechanical excavation 1 、 main machines and tools: (1)

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档