家装中不容忽视的N个验收问题a(N acceptance problem that can not be ignored in home improvement a).docVIP

家装中不容忽视的N个验收问题a(N acceptance problem that can not be ignored in home improvement a).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
家装中不容忽视的N个验收问题a(N acceptance problem that can not be ignored in home improvement a)

家装中不容忽视的N个验收问题a(N acceptance problem that can not be ignored in home improvement a) N acceptance problems that can not be ignored in home improvement 1, hot water pipe should be color separation construction; if the amount of renovation is not large, hot water pipe can replace the cold water pipe, but the cold water pipe can not replace the hot water pipe to take care of the pipe. 2, the water pipe should be set pipe clamp must be firmly installed. 3, waterways after the completion of the transformation must do pressure test, (general waterway 8 pressure), after voltage regulation, within half an hour the pressure drop is not more than 0.05MPa qualified. Otherwise, the next process is not allowed or the pipe is covered. 4, install the toilet, wash basin, do not allow the use of cement. 5. The distance between the water pipe and the electric pipe should be kept at least 200mm. 6, prohibit the use of direct drill slotting, cutting machine should use auxiliary slotting drills; lightweight wall lateral slot does not exceed 500mm; bearing wall in principle does not allow transverse slotted (and sometimes according to their own requirements with the exception); inner insulation wall transverse sloting not more than 1000mm; the top slot must be agreed by the management departments and the owners, depth of not more than 20mm, with a hose sleeve sheathed wire. 7, PVC flame retardant pipe material: PVC flame retardant pipe wall thickness of not less than 1.3mm, it should be 1.6mm 8, to ensure the quality of the cassette. 9, the wire through the pipe laying, the pipe shall not have joints, kinks. 10, prohibit strong electricity and telephone, network, sound, television and other communication lines installed in the same pipeline. 11, wires, bushings, pipe bending elbow as much as possible, is conducive to future changes in line 12, casing cassette with lock. 13, soft tube in principle can only be used in the top surface slotted line, and if the load-bearing wall slotted line c

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档