建筑给排水设计与施工中常见质量问题及防治(Common quality problems and prevention in design and construction of building water supply and drainage).docVIP

建筑给排水设计与施工中常见质量问题及防治(Common quality problems and prevention in design and construction of building water supply and drainage).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑给排水设计与施工中常见质量问题及防治(Common quality problems and prevention in design and construction of building water supply and drainage)

建筑给排水设计与施工中常见质量问题及防治(Common quality problems and prevention in design and construction of building water supply and drainage) Common quality problems and prevention in design and construction of building water supply and drainage 1 、 pipe pressure test and flushing problem (1) confusion strength test and tightness test. The strength test pressure is higher than the work pressure, the time is short; the tightness test pressure is equal to the work pressure, the time is long, cannot substitute for each other. (2) test pressure and drain water instead of pipeline flushing. Tap water or water pumped by the pump will be used to flush the pipe. Otherwise, the rubbish in the pipe can not be washed away, the water quality will be polluted, and the tightness of the valve will be affected. (3) there is air in the test tube, which makes the reading of pressure meter unstable. The relief valve shall be installed at the top of the system. (4) the district control valve is used as the isolation measure of the section pressure test, and the test pressure is often failed because of the leakage of the valve. Application of blocking plate or plug as a temporary isolation. (5) the partial shut off valve is deliberately closed when the whole pipeline is under pressure test, which results in short test pressure pipe and qualified capacity, but the integrity of the test is lost. Supervisors should carefully check and mark to prevent fraud. (6) the pressure gauge is not qualified. The supervisor shall check that the pressure gauge can be reset to zero. It is better to install two qualified pressure gauges for comparison purposes. 2 、 quality problems of septic tanks, inspection wells and outdoor drainage pipes Septic tanks, inspection wells and outdoor drainage pipes and other engineering content, belong to the construction of water supply and drainage design category, but by the construction of professional civil engineering, water professionals often ignore inspection and lead to qualit

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档