建筑钢筋算量小技巧~(Small amount of construction steel skills ~!).doc

建筑钢筋算量小技巧~(Small amount of construction steel skills ~!).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建筑钢筋算量小技巧~(Small amount of construction steel skills ~!)

建筑钢筋算量小技巧~(Small amount of construction steel skills ~!) 1, the first should be familiar with the tender documents and drawings, and this time should pay attention to is that there are relatively rare materials and processes, and if so, should be prepared as soon as possible material prices or subcontracting prices. 2, next, I usually collect material prices, mainly bulk materials. Such as commodity concrete and steel and cement prices (consider tax factors), brick price, it should be noted here is to see the bidding contract, if the contract price, then we just saw the price, but also on the material of the trend, this time to ask some of the materials long-term cooperation with us the comparison of their material price information. Years of experience in business have made them sensitive to the material market. In addition, we should pay more attention to the relevant policies of the state, that is, the trend of the environment. Whats more, if in the north, the engineering materials of many cities are monopolized by local gangsters, so that the price should be higher than the average price of the market. In a word, we should spend more time on it. Otherwise, a big mistake ah, in addition to pay attention to leave some margin ah. 3, the next step is to determine the artificial price, as we all know, in civil engineering, installation of fixed fee to those artificial cleaners boss people are not willing to do, because it is too low, now more common:) in accordance with are made of baogongdui bag cleaning services, according to the concrete work, plasterer, reinforced several types of woodworking industry, subcontracting. If there is a long-term cooperation team, can let them see the drawings to give us a quotation, this thing generally they are reported very much, in my experience. The main stage of concrete frame structure common in general is 35 yuan /m2 or so, including the main basis of concrete filled wall (generally based on a calculated construction area), 28

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档