建设工程竣工验收备案表填写及申报材料说明(Completion of the construction project acceptance check list and fill in the declaration materials).doc

建设工程竣工验收备案表填写及申报材料说明(Completion of the construction project acceptance check list and fill in the declaration materials).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
建设工程竣工验收备案表填写及申报材料说明(Completion of the construction project acceptance check list and fill in the declaration materials)

建设工程竣工验收备案表填写及申报材料说明(Completion of the construction project acceptance check list and fill in the declaration materials) Completion of the construction project acceptance check list and fill in the declaration materials First, HYPERLINK /doc/zl50525.doc project completion acceptance form (two copies) to fill in 1, cover: The project name column: fill in the names should be consistent with the construction project planning permit or license project name. The construction of unit column: construction units and construction units should be the corporate seal name consistent. 2, page 1: The project name, address Engineering column: fill in the names should be with the construction project planning permit or license the project name, project address consistent. The construction project completion and acceptance for the construction area column: fill in the area should be permitted and construction permit in the construction scale is consistent. The project is divided into categories: housing construction, municipal engineering, decoration engineering, fill out the actual situation according to the project construction unit. Finally, the name column: consistent fill in each unit and the construction units should be the full name of corporate seal. The filing time: paper documents filing agency date. Legal representative (signature): the signature shall be signed by the legal representative; if the signature of the authorized person designated by the legal representative shall be issued, the power of attorney signed by the legal representative shall be issued. Two, the completion of the project acceptance documents (in duplicate) requirements: First, project completion and acceptance of the original report: in the project completion acceptance report, its main contents include: project overview, basic construction program evaluation of construction units, engineering survey, design, construction, supervision and other aspects of the project completion acceptance time, proc

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档