- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
开怀蛸料(Laughing Octopus material)
开怀蛸料(Laughing Octopus material)
Rules and regulations for the implementation of steel structure catalogue 1 project features 2 supervision work flow 3 supervision work control points and target values 4 supervision methods and measures
1 engineering characteristics of this project A area overhead layer and a layer of frame structure of the steel truss structure is used only two multi-purpose hall roof. Two multi function hall steel roof truss structure of the steel truss and reinforced concrete columns to support hinged connection of the engineering structure and auxiliary materials are used Q-235B the F grade steel roof with 0.9mm thick HV - 460 silver button type fluorocarbon Aluminum Alloy plate +120mm thick cotton insulation aluminum foil veneer in the exergy Owens 12K +0.45mm thick white Fu V 900 color pressed veneer. The administrative center uses the steel roof structure of the truss beam and reinforced concrete column hinge connection according to the project of steel structure are made of Q-235B steel roof and floor laying 0.5mm thick HV - 460 type in blue color exergy Ankou type steel pressure type single plate the plate laying 100mm thick insulation cotton Owens 12K the white exergy polyester veneer Benxi Iron and steel structure construction is divided into two parts: the first part steel and steel components in steel factory production and processing the then processed steel parts and steel components packing box shipped to the site. Second the implementation of steel structure installation at the site of the pre assembly after assembling the lifting. Finally, the steel structure coating project is carried out. The structure of the Ruian Architectural Design Institute Co. Ltd. the design by the Ruian city construction steel structure branch application
2 supervision work flow of raw material inspection, quality supervision of steel parts factory parts factory parts detailed design of steel making, pre assembled steel factory, steel pretreatment coating
您可能关注的文档
- 家装配色(Home decoration).doc
- 家里的烂菜叶、西瓜皮、坏掉的蔬菜水果,别扔(The home of the rotten leaves, broken watermelon, vegetables and fruits, don't throw).doc
- 家装中不容忽视的N个验收问题a(N acceptance problem that can not be ignored in home improvement a).doc
- 家长会心得体会(Parents' meeting experience).doc
- 家长如何帮助孩子树立信心_提高学习成绩(How can parents help their children to establish confidence _ improve learning).doc
- 家电产品开发设计一般流程(General process of development and design of household appliances).doc
- 家长如何引导幼儿情绪(How do parents guide young children's emotions).doc
- 家长对幼儿园满意度问卷调查(Parents questionnaire on kindergarten satisfaction).doc
- 家长怎样辅导孩子的学习(How do parents teach their children to learn).doc
- 宽容与原则(Tolerance and principle).doc
- 开始的商务信如何写(How do you start your business letter).doc
- 开挖机(Excavator).doc
- 开服装店货品管理秘籍第二节(Open clothing store product management cheats section second).doc
- 开机不自检原因(Boot no self check reason).doc
- 开机启动加速相关,实现20秒开启电脑进系统(Boot up acceleration related, to achieve 20 seconds to open the computer into the system).doc
- 开机加速2(Boot speed 2).doc
- 开机提速及XP问题(Boot speed and XP problems).doc
- 开机自检后显示无效boot.ini文件,正在从Cwindows启动.(After the boot check, the invalid boot.ini file is starting from Cwindows).doc
- 开机自检故障解析(Trouble shooting on self startup).doc
- 开机菜单基本常识(Boot menu Basics).doc
文档评论(0)