简述客运专线箱梁运架装备分离式运架设备通过隧道时的工况(A brief account of the working conditions of the box girder transportation equipment for passenger dedicated lines and the adoption of the separated carrier equipment through the tunnel is given.docVIP

简述客运专线箱梁运架装备分离式运架设备通过隧道时的工况(A brief account of the working conditions of the box girder transportation equipment for passenger dedicated lines and the adoption of the separated carrier equipment through the tunnel is given.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
简述客运专线箱梁运架装备分离式运架设备通过隧道时的工况(A brief account of the working conditions of the box girder transportation equipment for passenger dedicated lines and the adoption of the separated carrier equipment through the tunnel is given

简述客运专线箱梁运架装备分离式运架设备通过隧道时的工况(A brief account of the working conditions of the box girder transportation equipment for passenger dedicated lines and the adoption of the separated carrier equipment through the tunnel is given A brief account of the working conditions of the box girder transportation equipment for passenger dedicated lines and the adoption of the separated carrier equipment through the tunnel is given (1) the low beam beam passing through the tunnel (when the beam is 2000mm high). The distance from the edge of the box girder of tunnel lining is only 89mm, if not removed part of the box girder flange or lower arch height, can through the tunnel transport box girder, but not by ordinary beam transporting vehicle. (2) the tunnel invert two filled low beam car through the 250km/h tunnel condition (girder transport vehicle at high 2000mm), we can see that the two time construction of tunnel invert (tunnel filled reserved 50cm, set aside a portion in bridge erection after the completion of the two filling), can through the tunnel transport box girder. When the whole frame is passing through the tunnel, the TTYJ900 double beam type is taken as an example. Through the use of CAD alignment, on-site verification, girder crane box girder low through the tunnel, without cutting the precast beam and the two place in the flange, graded backfill arch, the tunnel can be carried out according to the design organization. Erection of box girder with special case of separated bridge erecting machine (1) the erection of the tunnel entrance condition (box girder with a hole for guiding beam type bridge erecting machine as an example), the bridge machine cantilever folding, tunnel inlet to the abutment parapet at least 15m distance. (2) the erection of box beam condition (in tunnel outlet hole for guiding beam type bridge erecting machine as an example), the bridging machine is located in the low shipping status, not lifting bridge machine in the tunnel, the tunnel need to ex

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档