- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
题目简介库存管理上的三种付款方式预付-现金-延付.PDF
演講者:鄧進財教授(William Paterson University)
題目:簡介庫存管理上的三種付款方式:預付-現金-延付
Inventory control with different-type payments
1. First of all, Harris (1913) adopted a cash payment to establish the traditional economic
order quantity (EOQ) model in order to obtain the optimal order quantity.
2. Second, to capture the fact that a seller frequently offers a buyer a permissible delay in
payment to increase sales, Grubbstrom (1980) and Teng (2002) used a credit payment to
derive optimal order quantity. The reader is referred to the detailed review by Seifert et al.
(2013).
3. Third, Zhang (1996) presented an advance payment for a customer to save time and
money by prepaying a larger payment than the small billed amount for costs such as
electricity, water, or telephone bills.
4. Fourth, in order to reduce default risks, Teng (2009) proposed a cash-credit payment (i.e.,
some in cash and the remainder in credit) for a retailer to deal with credit-risk customers.
5. Fifth, Taleizadeh (2014) used an advance-cash payment (i.e., some in advance and the
remainder in cash) to study the situation in which a gasoline supplier asks a gas station to
prepay a portion of the purchasing cost when placing an order and to pay the remainder in
cash on delivery.
6. Sixth, Zhang et al. (2014) studied an advance-credit payment (i.e., some in advance and
the remainder in credit) to reflect a seller utilizing a partial advance payment to avoid the
risk of order cancellation, and a permissible delay in payment to stimulate sales volume.
A real-world problem
If you want to install a new roof or repair a driveway, you must go through the following
three steps:
Step 1.
A contractor requests you pay an advance payment when signing a co
您可能关注的文档
最近下载
- 吊篮日常检查记录.doc VIP
- 16S401 管道和设备保温、防结露及电伴热.docx VIP
- 2025年黑龙江、吉林、辽宁、内蒙古高考地理试题评价分析与教学反思理试题评价分析与教学反思.docx
- 2019人教版高中数学A版 必修第2册《第九章 统计》大单元整体教学设计[2020课标].pdf
- 人教版(2024)八年级上册英语Unit 1 Happy Holiday教案.docx
- 建筑装饰设计基础第1章电子课件 .pptx VIP
- 心理健康教学课件:七年级上第1课走进心理健康课.pptx
- 天然气调压器切断阀介绍.ppt VIP
- 对外汉语时间教学.ppt VIP
- 《人造板工艺学》课件 第十三单元 生产工艺设计.ppt VIP
文档评论(0)