全国电工进网作业许可考试试题(a1—a2卷)(Examination questions of national electrical network operation permit (A1 - A2)).doc

全国电工进网作业许可考试试题(a1—a2卷)(Examination questions of national electrical network operation permit (A1 - A2)).doc

  1. 1、本文档共33页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全国电工进网作业许可考试试题(a1—a2卷)(Examination questions of national electrical network operation permit (A1 - A2))

全国电工进网作业许可考试试题(a1—a2卷)(Examination questions of national electrical network operation permit (A1 - A2)) National work permit test for electrical access network High voltage theory examination questions (2008, A1 volume) A single top choice (options for each question, only one of the most to do, 1 points for each question, the wrong election or not is 0, a total of 40 points) 1. electrical equipment from the accident to overhaul should be (A) A. fill in the work ticket, B. can not fill in the work ticket, direct maintenance, C. report, the leadership of the overhaul; 2. voltage fluctuations are expressed as a percentage of a voltage rating during the period of voltage variation (B) A. voltage actual value and voltage rating. B. voltage maximum and voltage minimum. C. voltage maximum and voltage rating 3. insulation gloves and insulation shoes should be tested periodically, the test cycle is generally (C) months A.1; B.3; C.6; D.12; 4., the most reasonable current density, obtained by comparison of various economic and technical aspects, is called (B) A. rated current density; B. economic current density; C. allowable ampacity; D. rated ampacity; 5. power supply quality refers to power quality and (A) A. power supply reliability; B. power supply economy; C. power supply service quality; 6. switching operation, should be first in (B) to simulate the operation. A. B. simulation of the actual equipment on board; C. operation ticket; D. blank sheet; 7. the transformer two winding short circuit (A) applied voltage to make its current reach the rated value, at this time the applied voltage is called the impedance voltage A. primary winding; B. two winding; C. high voltage winding; 8. in power systems, (A) can connect lines of different voltage levels A. transformer; B. current transformer; C. voltage transformer; The rated current range of the 9.GN2-10 series isolation switches is (A) Amperes A.400-3000; B.540-2000; C.630-1000; 10. the magnitude of the transformers temperat

文档评论(0)

jgx3536 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档