全站仪使用说明(The use of total station instrument).docVIP

全站仪使用说明(The use of total station instrument).doc

  1. 1、本文档共23页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
全站仪使用说明(The use of total station instrument)

全站仪使用说明(The use of total station instrument) Construction lofting instruction (1) construction survey lofting process flow diagram; (two) construction survey lofting method and requirements; I. instructions The guide book is written according to the conventional method of lofting, lofting personnel must according to the actual situation, such as precision, the distribution of control points, the existing equipment, site conditions, calculation tool to select the measurement site and lofting points Different combinations of different design methods and different methods of nuclear examination. Different construction and the same project at different stages, different parts of the lofting accuracy requirements are different, so The accuracy requirements of the test site and the lofting point are also different. Please strictly implement the engineering survey norm and water during the operation Code for construction survey of electric hydraulic engineering and construction survey control procedure. The restrictions mentioned in this book refer to the specification If the design has special requirements, according to the design requirements of the implementation. Two, data collection and lofting plan formulation 1. before surveying and setting out, the plane and elevation control data of the construction area shall be obtained from the legal and effective way. 2., according to the site control point signs are stable and well, and so on, the existing control point data analysis, accurate Determine whether all or part of the control points are detected. 3., the existing control points can not meet the precision requirements, should be re layout control, the existing control point density can not meet the release The sample should be encrypted according to the existing control points. 4., according to the formal design drawings, documents, modify notice of measurement lofting, not by oral notice and without Approved layout of drawings. 5., according to the specifications

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档