- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
富你(You are rich)
富你(You are rich)
Safety operation rules for all types of work
A, furnaceman, iron industry
1, before the job, you must wear good labor protection products, strictly prohibit wearing wet gloves, wear wet overalls and shoes, wear bad, no posts, do not open your mouth when you work.
2, to achieve civilized production, the platform is good, clean and clean, no water around the furnace and other debris.
3, after the shift must be ready for anything, carefully check the tools and furnace tamping machine. If the electrical par10, operators on the principle of electric furnace transformer is not allowed to overload, but only allow 20% of the rated load, the maximum impact current of 30%, and shall not exceed 8 seconds.
Three. Electrode worker
1, the job must wear good labor protection products.
2, must check whether the tool is solid and intact, hammer electrodes must be brought with protective glasses.
3, in the general, loading and unloading electrodes, we should pay attention to moving, placing and stabilizing.
4, traffic or single beam lifting stand under the non lifting electrode, lifting material, personnel around 2 meters away from the outside.
5. The electrode is connected with the crane and the electrode is clamped by the special clamp. The tightening joint must be firm and flat, the surface shall not be convex and concave, and the surface impurities shall be removed.
6, the electrode length should be carefully checked before the electrode quality, such as roundness, surface and silk first, unqualified electrodes are not allowed to use, and when the length of the old and new electrodes of the center, in a straight line, must not be distorted.
7, the operator or iron tools and other metal blocks can not contact the two phase electrode at the same time, in case of personal and equipment accidents.
8, after the electrode work is finished, the electrode platform must be cleaned.
Four 、 furnace maintenance worker
1, before going to work to wear good labor protection pro
您可能关注的文档
- 名画家作品地址(Famous painter's address).doc
- 后张法预应力混凝土t梁预制(Post tensioned prestressed concrete; T beam; precasting).doc
- 向超市管理者进言(To the supermarket management advice).doc
- 后现代哲学与哲学主体性(Postmodern philosophy and subjectivity of Philosophy).doc
- 名师崇拜与中小学教师群体的思想贫困(Worship of famous teachers and ideological poverty among primary and secondary school teachers).doc
- 向高科技零售业演变(Evolution to high tech retail).doc
- 吕蒙正 任务介绍2(Lv Mengzheng mission presentation 2).doc
- 君子人格的基本品德(The basic character of a gentleman's personality).doc
- 君特·格拉斯简介(Gunter Glass introduction).doc
- 否定的辩证法在自然与历史的关联中(Negative Dialectics in the relation between nature and history).doc
- 封神演义秘籍(Myth of the gods).doc
- 小剧场戏剧与表演教学(Small theatre, drama and performance teaching).doc
- 小型焦末成型机价格(Small coke forming machine price).doc
- 导航仪常见问题(修正)(Common navigation problems (Amendment)).doc
- 室内照明设计技巧大盘点(Interior lighting design skills market point).doc
- 小学2012-2013学年度上学期教学工作计划(The teaching plan for the first semester of the 2012-2013 year of primary school).doc
- 小学数学应用题大全(Mathematical problems in primary schools).doc
- 小学生交通安全教育课教学设计(第1-4课)(Teaching design of traffic safety education for primary school students (lesson 1-4)).doc
- 小学生常用成语大全(Idioms for pupils).doc
- 小学语文阅读分析解题步骤与方法(Elementary school Chinese reading analysis solution steps and methods).doc
文档评论(0)