2012年一级建造师《建设工程经济》模拟题0901(In 2012, a construction engineer construction engineering economy mock up 0901).docVIP

2012年一级建造师《建设工程经济》模拟题0901(In 2012, a construction engineer construction engineering economy mock up 0901).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2012年一级建造师《建设工程经济》模拟题0901(In 2012, a construction engineer construction engineering economy mock up 0901)

2012年一级建造师《建设工程经济》模拟题0901(In 2012, a construction engineer construction engineering economy mock up 0901) First class construction engineer construction project economy in 2012 A multiple-choice questions (20 questions, a total of 40 points) 1, according to the construction document [2003]206, which belongs to the measure fee. A. project sewage charges, B. inspection, test fees, C. large machinery and equipment import and export and security, D., construction water, precipitation, E., safety construction costs 2, the use of formula calculation method of construction and installation costs of enterprise management fees, may be based on () for the calculation of the base. A. labor cost, B. labor cost + material cost, C. labor cost + construction machinery use fee, D. direct fee, E. material fee + construction machinery use fee 3, construction and installation tax refers to the provisions of the state should be included in the cost of construction and installation projects (). A. land use tax, B. sales tax, C. property tax, D. city maintenance tax, E. education surcharge 4, the construction and installation of direct engineering costs in the material costs of (). A. material, two handling fee, B. material inspection, experiment fee, C., reinforced concrete touch and scaffold fee, D. scaffold fee, E. material transportation loss fee 5. Cash flows from financing activities are (). A. capital premium, B. paid in capital, C. disposal, net cash recovered from fixed D., cash received from investment recovery, E. received cash received from investment income 6 of the following items, which belong to inventories, have (). A. turnover material, B. low value consumables, C. temporary facilities, D. construction products, E. construction products under construction 7, included in the enterprise business expenditure items have (). A. B. donation expenditure shortage of fixed assets is C. D. loss of income tax expense E. asset impairment losses 8, the enterprises paid in capital ha

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档