09年二级建造师水利水电管理与实务练习题汇总(09 year two construction division, water and hydropower management and practice exercises summary).docVIP

09年二级建造师水利水电管理与实务练习题汇总(09 year two construction division, water and hydropower management and practice exercises summary).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
09年二级建造师水利水电管理与实务练习题汇总(09 year two construction division, water and hydropower management and practice exercises summary)

09年二级建造师水利水电管理与实务练习题汇总(09 year two construction division, water and hydropower management and practice exercises summary) 09 year two construction division water conservancy and hydropower management and practice exercises (1) 1. according to the technical specification for construction of underground excavation of hydraulic structures (DL / T5099 - 1999), blasting materials shall conform to the construction conditions and technical standards. The performance tests must be carried out before each batch of blasting material is used. The A. industry provides that the B. states require the C. government to specify the D. design requirements 2. according to the technical specification for construction of underground excavation of hydraulic structures (DL / T5099 - 1999), the distance from the safe place to the blasting face shall be no less than (). A.50m B.100m C.150m D.200m 3. according to the hydraulic structure of underground excavation engineering construction technical specification (DL / T5099 - 1999), two working face in the opposite direction from the excavation () or () times the diameter distance when shooting, the two sides are required to evacuate personnel working face. A.30m, 5 B.25m, 5 C.30m, 3 D.25m, 4 4. according to the technical specification for construction of underground excavation of hydraulic structures (DL / T5099 - 1999), two sides of the excavation shall be separated from each other, A.15m B.12m C.10m D.8m 5. in accordance with the technical specifications for blasting construction of hydropower and water conservancy projects (DL / T5135 - 2001), the location, structure and facilities of blasting equipment, storage and storage rooms must be approved by the competent authorities and approved. A. quality supervision department, B., local public security department, C. project, legal person, D. supervision unit 6. according to the water conservancy and hydropower project construction organization design specification (SL303 - 2004), construction

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档