- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
12市政冲刺题第三套(12 municipal sprint questions third sets)
12市政冲刺题第三套(12 municipal sprint questions third sets)
In 2012, the first grade construction division municipal engineering sprint questions third sets
First, individual choice questions (20 questions, 1 points each). Each item options, only 1 of the most to do)
1. the width of cement concrete pavement cushion should be the same as the width of subgrade, and the minimum thickness is () mm.
A.50
B.80
C.120
D.150
2., for the rapid growth of traffic flow and driving frequency, the axle load of passenger cars is constantly increasing, and the hot mix asphalt mixture of urban main road and urban expressway which is strictly divided into single lanes and one-way traffic is ().
A. modified asphalt mixture
B. asphalt mastic macadam mixture
C. modified (Li Qing) SMA
D. ordinary asphalt mixture
3. the strength of lime stabilized soil increases with age, and is closely related to the curing temperature. When the temperature is below (c), the strength is almost no increase.
A.O
B.5
C.8
D.15
4., modified asphalt mixture pavement should not be used () rolling.
A. tire roller
B. vibratory roller
C. three wheeled steel tube roller
Rolling of D. steel tube roller
5. the bridge without horizontal reaction under vertical load is ().
A. suspension bridge
B. rigid frame bridge
C. beam bridge
D. arch bridge
6., after the prestressed material, metal spiral pipe should be adopted () production, the production of metal spiral tube steel belt thickness is not small, to 0.3mm.
A. aluminized material
B. manganese plated material
C. chrome plated material
D. galvanized material
7., according to the hoisting equipment, beam and slab erection method is different, generally does not include the erection method is ().
A. crane beam method
B. span pier Longmen hanger beam method
C. through beam method
D. fixed Longmen hanger beam method
8., cover excavation method is a form of open excavation, and the main difference between the construction of the common open excavation method is that.
A. constructio
您可能关注的文档
- 酒店照明基本要求.doc
- 配配试验.ppt
- 配送中心审核问题.ppt
- 配套平台标准流程卡.doc
- 酒店礼貌和礼貌.ppt
- 采矿粉尘管理.doc
- 采煤面防水防尘设计.doc
- 采用LM137电源设计.ppt
- 酒店开幕式准备工作手册.doc
- 重型卡车技术协议.doc
- 12技能增强版使用说明(12 skills enhancement edition instructions).doc
- 12维度宇宙---三个主要议程和钻石太阳dna的展望(12 dimensional universe --- three main agenda and the prospect of diamond solar DNA).doc
- 13-铁氧化物-铜-金型矿床的地质特征、(Geological characteristics of 13- iron oxide copper gold deposit,).doc
- 12首动听的好歌歌词(12 Song song lyrics).doc
- 13-二、我国棉花生产(13- two cotton production in China).doc
- 13.2 甲板与船体保养(13.2 deck and hull maintenance).doc
- 13.42个生活金点子(13.42 life tips).doc
- 132位程序移植到64位平台前的准备工作(Preparation of 132 bit programs before porting to 64 bit platforms).doc
- 135即13日均线、34日均线、55日线,简称135线战法(135, that is, the 13 day moving average, the 34 day moving average, the 55 daily line, or the 135 line).doc
- 13《五彩池》人教版(13 colorful pond PEP Edition).doc
文档评论(0)