- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
瓷砖施工注意事项(Notice of ceramic tile construction)
瓷砖施工注意事项(Notice of ceramic tile construction)
The preparation process of cement mortar paving with glazed tile and floor tile:
1. materials preparation including ceramic tile, base material, leveling material and adhesive material.
2, paving tool preparation ---- safe and good tool is the guarantee of smooth construction.
3, the basic cleaning - --- the surface of the base of the adhesive strength of loose objects, dust and oil stains removed.
4, on the base for the purpose of enhancing the leveling layer, tile bonding layer on the wall and ground adhesion strength.
5, wipe leveling layer ---- find the reference plane, to ensure tile surface laying smooth.
6, the bullet line separation ---- draw line pre row, determine each tile paving reasonable position.
7, stick tiles.
8. Cut seam, wipe seam and clean tile surface (seamless brick and glazed tile need not leave seam).
9, maintenance.
2, glazed tile ground construction process:
1. First clean the site and clean the surface of the concrete to avoid the influence of impurities;
2. at the site of construction, measure the highest horizontal points, with this point on each wall (do not remove the bump, the mortar can not be lowered more than 6cm);
3, preparation of powder cleaning cement, sand 1:4 ratio and glue (e.g. 107 glue), cement paste, hydromorphic soil water;
4. Sprinkle some water on the ground first;
5. Sprinkle cement powder on the ground before construction;
6, and sweep evenly with broom, in order to increase the adhesion of the ground layer and cement mortar;
7, began to put the first row datum, each 1 square meters area, dry sand cement material with smooth wood trowel;
8, tile placed on the smooth cement sand, with the gavel, the level is confirmed, then dig the tile view grout lines, if not full, then fill the mud and sand.
9, dial (water / cement paste and seaweed powder and water) to dry up the hydration of cement mortar.
10, put on just have good tiles to gavel flat, to confirm the level to complete
您可能关注的文档
- 飞机在生活中的联系.doc
- 飞机气流.doc
- 风机频率控制.doc
- 预热器安装说明.doc
- 预热器一般介绍(培训).ppt
- 飞机性能 - 上升阻力的飞行.doc
- 飞3晶体管和放大器.ppt
- 食用虾挥发性碱性氮的测定.doc
- 食堂系统.doc
- 食物热值统计.doc
- 甘肃省省情(Gansu province situation).doc
- 生产率增长之谜(The mystery of productivity growth).doc
- 用万用表测线路板(Use multimeter to measure circuit board).doc
- 用一根网线连接两台电脑的方法汇总(The method of connecting two computers with a single cable).doc
- 用google搜索代码(Search code with Google).doc
- 用木门的材质工艺特点(Wooden door material, process characteristics).doc
- 甲午战争的意义影响(The significance of the Sino Japanese War of 1894).doc
- 甲板英语(Deck English).doc
- 申银万国-政策扶持农化、炼油符合预期,对煤化工控制总量超出预期-石化...(Shenyin Wanguo - policy support, agriculture, refining in line with expectations, the total amount of coal chemical control exceeded expectations - petrochemical...).doc
- 电信业大众业务难逃渠道冲突(Telecom Industry public business can not escape channel conflict).doc
最近下载
- 2007年考研英语一真题解析.pdf VIP
- 救护车司机培训计划.pptx VIP
- 人教版七年级上册数学第三章 一元二次方程练习题.docx VIP
- 20211121-华金证券-纺织服装行业周报:10月社零回升,消费市场回暖.pdf VIP
- 非均匀有理B样条:B样条曲面II及NURBS.pdf VIP
- 妇产科护理网络在线课程的教学设计与实践应用.pdf VIP
- 十年(2016-2025)高考化学真题分类汇编:专题40 化学反应原理综合题——反应热+速率平衡(原卷版).docx VIP
- 设备安装、维修合同模板7篇.docx VIP
- 广东六校2025届高三10月联考英语试题.pdf VIP
- 削坡减载施工方案.docx VIP
文档评论(0)