工程清单(Project list)

工程清单(Project list) 1. Radio questions (2 * 10=20) 1. earthworks, cushion low width 1400mm, excavation width 1800mm, length 220m based, according to the requirements of construction organization design, operation of working face 0.25m on each side, the slope coefficient is 0.3, the volume of earthwork for digging foundation (c) A.2.52m2 B.4.39m2 C.554m3 D.966m3 The 2. wall is different from the foundation. When the material is laid, the dividing line between the foundation and the wall is (d) A. design indoor floor elevation, B. design, outdoor floor elevation, C. material boundaries D. accordi