施工员试题选集(九)(Selected works of construction workers (nine)).docVIP

  • 1
  • 0
  • 约1.83万字
  • 约 17页
  • 2017-07-29 发布于河南
  • 举报

施工员试题选集(九)(Selected works of construction workers (nine)).doc

施工员试题选集(九)(Selected works of construction workers (nine))

施工员试题选集(九)(Selected works of construction workers (nine)) Construction item (nine) * * *. Source: site original update time: 2011-5-5 hits: 1210 Fill in the blanks The sources of aggregate used in the 1. large and medium-sized water conservancy projects are, (,), (,), and so forth. 2., the template according to the stand and work characteristics are divided into (), (,), (,) and (). 3., steel processing generally include (), (),, (), () and () and other processes. 4. concrete mixing plant is divided into (), (), (,), (,) and () five layers. 5. concrete in transit requires concrete (,), (,), (,), (,), and (?). 6. concrete dam construction, concrete horizontal transport, the most common way is (), there is (), or use (). 7. commonly used concrete vertical transport equipment have (), (), (), (). There are (), (), and (8.), the layout methods of Zhanqiao for placing concrete of tower crane. 9. the belt conveyer carries the concrete, the belt machines angle of inclination upward is not bigger than (), downward is not bigger than (), the belt movement speed should control in () the scope. 10. dam concrete pouring, block size and laying thickness have been fixed, the solution of no cold front between layers has () (), () (). The temperature change process of 11. mass concrete can be divided into (,), () and () three periods. 12. concrete dam construction, the temperature cracks have (), () two categories. 13. the purpose of temperature control of concrete dam is () and (). Part 14. basic concrete dam block method (), (), () and (). 15. winter work, concrete maintenance can use (), (), () and (). Two, multiple-choice questions 1. concrete dam construction, aggregate minimum safe reserve is about () day aggregate dosage. A. 5~10, B. 10~15, C. 15~20 2. the quality control standard of aggregate screening requires that the super diameter ratio is not greater than (). A. 5%B. 10%C. 15% Sand should be not less than 3. days of storage time () to dehydration. A. 3, B. 4, C. 5 When

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档