项目管理 文本文档(Project management text document).docVIP

项目管理 文本文档(Project management text document).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
项目管理 文本文档(Project management text document)

项目管理 文本文档(Project management text document) First, the multiple-choice question 1., the three major control objectives of project management are (B) B. schedule, quality and cost control 2 the following statement about the characteristics of the Gantt chart scheduling method, and the correct one is that (B) B. is applicable to manual scheduling 3. the monthly construction plan and the ten day construction plan of the project belong to (A, A. stage) 4., a sufficient condition for a critical line to become a network diagram is (C) C. total time difference is zero, free time difference is not zero 5., from the perspective of construction quality acceptance, the smallest construction quality acceptance unit is. (C) C. inspection lot 6. the Contractor shall organize the construction in accordance with the schedule approved by the supervisor, but due to the defects of the schedule itself and the delay in the construction period, the responsibility shall be borne by (A) the A. contractor 7. in the form of the following construction contract, the Contractor shall bear (B) B. fixed total price contract for all works and price risks 8., the composition of the double code network diagram does not include (A) A. working hours interval 9., the goal of network planning optimization is (C) C. predetermined 10. the earliest start time of a job is the maximum B. value of all its work (B) 11. the project proposal belongs to the whole life cycle (A) A. decision-making stage of construction project 12., the organizational structure model reflects the (D) D. directive relationship among the subsystems or elements in an organizational system 13. construction enterprise project manager is (D) D project management team leader 14. in accordance with the general contract clauses in the standard construction bidding document, the contractor may not undertake any engineering change without the (C) change instruction. C. Supervisor 15., in the construction quality management of engineering proj

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档