- 1、本文档共18页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
弱电工程各项通病(Common problems of weak current engineering)
There are many complaints in the application of intelligent subsystems, there are two reasons: one is product performance; two is the use of the problem. The following list for indoor intercom, CCTV, security, perimeter security, electronic patrol, meter reading system and parking lot management system design should pay attention to the staff.
Automatic meter reading system
Automatic meter reading system is the highest complaint rate in all subsystems, the main reason is not to copy the data, and then the water supply and power supply network is imperfect.
In addition to the indoor security system, that is, the highest rate of complaints. The main reason is that the meter reading system needs further improvement.
The remote meter reading system in most intelligent communities consists of four parts: Management Center, computer, transmission controller, collector and all kinds of meters. They can communicate with each other through RS485 bus, power line carrier, wireless data transmission, local telephone network, cable TV network and broadband IP network. Because of the different communication medium, they are divided into different meter reading modes.
In the residential area where the table is installed relatively, the collector and transmission controller can be transmitted by means of RS485 or power carrier. In the residential areas where the tables are installed, the transmission and transmission controllers are preferably transmitted by means of a digital or telephone network. For the three or more tables have been home, the best use of reading through bidirectional CATV network or broadband IP network meter reading method. Should pay attention to in using power line carrier transmission, because of Chinas power grid during the data transmission process, often by radio signals, electromagnetic signal, pulse signal interference, resulting in data transmission error code and missing code, so the development o
您可能关注的文档
- 00年国家公务员申论真题及答案(00 years of national civil servants Shanghai Zhenti and answers).doc
- 01二叉树顺序结构实现_bitreearray(01, two fork tree order structure to achieve _bitreearray).doc
- 001人工挖土施工工艺(001 construction technology of artificial excavation).doc
- 1、道路交通安全法律、法规和规章(185题)(1. Laws, regulations and regulations on road traffic safety (185 questions)).doc
- 1.1化学反应与能量的变化(1.1 chemical reactions and changes in energy).doc
- 1.基数词的各种形式(The various forms of 1. cardinal numbers).doc
- 1-电路知识回顾(1- circuit knowledge review).doc
- 1-1 空气(1-1 air).doc
- 1题意作文审题(1 Italy compositionsmoderators).doc
- 1三管交接班职责以及值班(1 、 three shift shift, duty and shift).doc
文档评论(0)