怎样应对土石方工程的变更、签证和索赔(How to deal with changes in earth and rock works, visas and claims).docVIP

怎样应对土石方工程的变更、签证和索赔(How to deal with changes in earth and rock works, visas and claims).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
怎样应对土石方工程的变更、签证和索赔(How to deal with changes in earth and rock works, visas and claims) How to deal with changes in earth and rock works, visas and claims? Handling changes, visas and claims events shall be managed in conjunction with relevant earthworks data. First of all, to clear the scope of the event; secondly, to clear the content of the work and the amount of work; again, to clear the sub unit price combination of what items included in the price 1. empirically Does the owner (or the general contractor) provide the contractor with the relevant data for earthwork construction (subject to data listing, receipt, content and time)?. If the information is incomplete, the contractor is not at fault; if the data is complete, the experienced contractor shall consider some possible or unlikely sub item price combinations and how to make an offer. For example, to get rid of the old base, large concrete or reinforced concrete excavator to dig or dig bucket lift, consideration should be given to get rid of the workload and get rid of (whether the deduction of reinforced in reinforced concrete value depending on the situation); not including real fixed work content, such as static pressure pile extra the pile head, produced by a small excavator digging the mechanical efficiency reduction. Has no fault case, can be regarded as the other work content, partial combination price leakage. 2. on duty The formation of pit slope slope after the collapse, to analyze the reasons of such as the slope soil meets the engineering geological investigation report, the existence of confined water or underground pipe ditch, pile soil whether according to the design requirements from the pit side slope above 3m_, the slope coefficient is consistent with the soil load requirements, concrete shoulder width small drop (check, row) water meets the excavation construction requirements and whether there is abnormal weather etc.. The responsibility of the unit is determined by the cause of the acci

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档