2010年造价工程师考试《土建》精华资料汇总(In 2010, cost engineer exam civil construction essence data summary).doc

2010年造价工程师考试《土建》精华资料汇总(In 2010, cost engineer exam civil construction essence data summary).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
2010年造价工程师考试《土建》精华资料汇总(In 2010, cost engineer exam civil construction essence data summary) DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view. Annual cost engineer examination civil construction essence data summary, 2010 cost engineer exam civil construction essence data summary 1. order block hoisting block hoisting construction section according to the general order, the order is from outside to inside, the first distant past, after the first, stepped in between the adjacent construction section inclined. Cha should start from corner or block at the location of masonry walls and masonry masonry joints should meet the wrong the lap, horizontal and vertical surface cleaning requirements. The main processes of 2. blocks (1). The ash spreading good consistency (5 ~ 7cm) of the cement mortar shop, 3 ~ 5m long horizontal seam, the summer and the cold season should be shortened, paving should be smooth. (2) block installation in place. By using the friction type fixture arrangement will be required to block the hoisting block. Block in place should be according to the position of falling slowly, so the fixture center as far as possible with the center line of wall in the same vertical plane, smooth blocks on the same side, the vertical fall in the mortar layer, to block an aside, can Loosen the clamp. (3) correction. The fall and the supporting board in line with inspection of verticality, methods of inspection level alignment. With a crowbar, hammer. Adjust the deviation (4). The grouting mortar filling slits in a splint, the two sides of the building block, more than 3cm wide slits of concrete pouring with fine the stone is not less than C20, collecting water after caulking, namely jointing. Since then, the general should not move the block to bond strength against the destruction of mortar. (5). When the brick blocks appear larger slits or lintel for peacetime, should

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档