投料试车应具备的条件(Conditions for the commissioning of the material).docVIP

  • 16
  • 0
  • 约1.2万字
  • 约 15页
  • 2017-08-03 发布于河南
  • 举报

投料试车应具备的条件(Conditions for the commissioning of the material).doc

投料试车应具备的条件(Conditions for the commissioning of the material) Conditions for the commissioning of the material project Check content Responsible department Person liable Completion time Remarks I. intermediate handover of project (7) 1, the quality of the project is qualified; 2, the three fixed problem of eliminating defects rectification is completed, left tail has finished processing; 3 、 the design alteration project affecting the feeding has been finished; 4, the project has handled the intermediate handover procedures; 5. Temporary facilities for the construction of the facilities have been completely removed. The site is clean, free of debris and barrier free; 6, equipment number and pipe medium name, flow direction is complete; 7 、 system sweeping, cleaning, airtight finish. Two, Linkage test has been completed (5) 1, drying, replacement, three agent loading, computer instrument has been completed and confirmed by the joint; 2. The equipment is in good condition; 3 、 online analytical instrument and instrument have been used in debugging, and industrial air conditioner has been put into use; 4 、 instrument, computer detection, control, interlocking, alarm system debugging, accurate and reliable; 5, post industrial equipment has been installed. Three, Personnel training has been completed (4) 1, domestic and foreign similar equipment training, internships have ended; 2, have job training, simulation training, anti accident training, to achieve the three know six (three to understand: understand the principle and understand the structure and understand the solution procedures; six: knowledge map, operation, maintenance, will will be calculated, will contact and troubleshooting), to improve six abilities (thinking ability, operation, operation ability, coordination ability, anti accident ability, self protection ability, self-control ability); 3, all types of personnel through the examination qualified, has obtained the job card; 4, have been compiled in domesti

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档