砖砌基础施工技术(Construction technology of brick foundation).docVIP

砖砌基础施工技术(Construction technology of brick foundation).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
砖砌基础施工技术(Construction technology of brick foundation) Basic construction technology of brick foundation construction technology 1. Brick foundation construction 1. Classification: strip foundation and independent foundation 2. Big leg: Height: two PI, one quarter brick (60mm). Unequal height: two skin and one collection, one quarter brick (60mm) 3. The bottom width of the large drop foot is determined by the design. 4. Dust cushion layer: The soil is laid under the ground (3:7 or 3:8) or trialsoil 1:2:4 or 1:3:6. The height and thickness of the cushion shall be determined by the design. 5. Moisture-proof layer The 20mm moisture-proof layer of cement waterproof mortar is usually set at 60mm below the first floor of the indoor floor. The vertical moisture-proof layer is generally applied to hot asphalt 2. Ii. Construction preparation 1. The material (1) ordinary clay bricks Standard brick size for 240mmX115mmX53mm. The five strength levels are MU30, MU25, MU20, MU15 and MU10. The appearance requirement must not have warping, crack, lack of edge Angle and other defects, the sound is loud when striking. The label of the brick must meet the design requirements, and should have the factory certificate and test report. (2) cement Pusi cement or slag cement. Old or damp cement must be tested and used according to test results. (3) the sand The medium sand content is less than 5%. (4) water Drinking water or natural water. 2. The machine (1) machine: mortar mixer (2) tools: in shenzhen, tile, plane froe, burden hammer plate, wire, wood folding rule, brick clip, pound said, skin for pole, bucket, kettle, spirit level, rubber hose, shovel, a broom, a sieve, cars, etc. 3. Operating conditions (1) the base groove, the cushion layer acceptance, the elevation, the axis of the check, has finished the hidden acceptance procedures. (2) lay the foundation of brick on the mat and the edge of the big leg. (3) take the flatten pole. In the corner of the corner, the corner of the corner.

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档