- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
MRP常见例外信息(Common exception information for MRP)
Common exception information and explanation of SAP MRP
00: represents the latest data of MPS or MRP, and the exception message is disappeared after storage.
01: routine reminder that this order has been automatically changed by the system and is applicable to orders that have not been processed
02: the date of order creation is in the past, and may not be handled in a timely manner
03: the new planned order start date is in the past;
04: the new plan for the project is over in the past.
06: not the new planned order, the start date is in the past;
07: not the new plan order, the end date is in the past;
10: the system recommends that the planned order be advanced due to demand or temporary increase in demand.
15: it is recommended to postpone the delivery date and give a rescheduled date
20: because of the cancellation of demand, the system recommends the cancellation of the planned order;
30: the delivery date cannot be met in advance. The date of delivery based on demand is in the past, since the actual date of delivery can only be started from the current date.
42: the orders proposal has been changed for quantity
51: no BOM is created;
52: there is no BOM in the term of validity, which means the validity of BOM does not match the order.
62: technical route error or no process line
64: unable to meet the delivery date of the order, the system is arranged according to the process route and found that the actual completion date is after the delivery date.
96: existing stocks are lower than safe stocks
98: the plan is not over
Related elements of MRP
Factory inventory: Stock
Safe inventory: safe
Warehouse inventory: SLockSt
Single customer inventory: CustSt
Customers consignment inventory (availability check) : CCsgmt
Project inventory: ProjSt
Have the inventory of the excocontractor: SubcSt
Batch inventory: BtchSt
Batch/warehouse inventory: BtSLoc
Quality control inspection batch: qm-lot
Planned order: PldOrd
Mock or
您可能关注的文档
- 物品调和列表(List of items).doc
- 消除皱纹的12个最简单方法(12 easiest ways to remove wrinkles).doc
- 消防安全日巡查记录表及设备检查表(Fire safety daily inspection record and equipment checklist).doc
- 消防安全设计(Fire safety design).doc
- 消防安全隐患整治工作方案(Fire safety hidden trouble rectification work program).doc
- 消防电梯(Fire elevator).doc
- 消防保养(Fire maintenance).doc
- 消防疏散演练中的问题(Problems in fire evacuation drills).doc
- 消防通道知识(Fire lane knowledge).doc
- 消防预算知识点集锦(Fire budget knowledge highlights).doc
- 2026年郑州美术学院辅导员招聘备考题库附答案.docx
- 深度解析(2026)《SL 131-1995混凝土坍落度仪校验方法》.pptx
- 2026年郑州城市职业学院辅导员招聘备考题库最新.docx
- 2026年郑州幼儿师范高等专科学校辅导员招聘备考题库附答案.docx
- 2025年超级电容器十年智能学校备用电源报告.docx
- 2026年郑州电子信息职业技术学院辅导员招聘备考题库最新.docx
- 2026年郑州升达经贸管理学院辅导员招聘备考题库最新.docx
- 2026年郑州商贸旅游职业学院辅导员招聘备考题库最新.docx
- CAD2014中级教程:手机与电脑端指南.pdf
- 2025年地铁照明行业技术发展趋势研判报告.docx
原创力文档


文档评论(0)